| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.8 LAdmitted-Finance 127 3 LOWER BAZAR SHIMLA HP | SHIMLA | SHIMLA | HIMACHAL PRADESH | L1 | Admitted-Finance | |
| 2 | L2₹28 L+₹3.2 L (12.7%)Admitted-Finance HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L2 | Admitted-Finance | |
| 3 | L3₹29.5 L+₹4.6 L (18.7%)Admitted-Finance R O 127 3 LOWER BAZAR SHIMLA 1 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | National Electrical Traders L1 | SS ENGINEERING WORKS L2 | Electro Mechanical Engineering Company L3 |
|---|---|---|---|---|---|---|
| 1.00 | Complete set rewinding of Stator of squirrel cage BHEL make 11KV motor 425KW/550 HP 2968 RPM, 50H/Z, 3 phase Induction motor having Sr. No. 48021A 402-11-06 at Kawalag & Sr. No. 45026A 402-11-02 at Ashwani Khad including cost of winding,insulation material, removing of old winding and rewinding with new winding material and allied jobs/material including all leads and lifts as per the direction of Engineer In Charge. | 2 | Job | 8,22,000 ₹16,44,000 | 7,75,000 ₹15,50,000 Lowest | 9,45,000 ₹18,90,000 |
| 2.00 | Complete set rewinding of Rotor of squirrel cage BHEL make 11KV motor 425KW/550 HP 2968 RPM, 50H/Z, 3 phase Induction motor having Sr. No. 48021A 402-11-06 at Kawalag including cost of winding,insulation material, removing of old winding and rewinding with new winding material and allied jobs/material including all leads and lifts as per the direction of Engineer In Charge. | 1 | Job | 4,45,000 ₹4,45,000 Lowest | 6,74,000 ₹6,74,000 | 6,10,000 ₹6,10,000 |
| 3.00 | Providing & Fixing bearing at drive end No.NU-228 ECG-C3 SKF make complete in all respect as per direction of Engineer-In-Charge.Sr. No. 48021A 402-11-06 | 1 | Each | 58,000 ₹58,000 Lowest | 1,24,500 ₹1,24,500 | 82,000 ₹82,000 |
| 4.00 | Providing & Fixing Bearing at drive end No.6228- MA/C3 SKF make complete in all respect as per direction of Engineer In Charge Sr. No. 48021A 402-11-06 | 1 | Each | 62,000 ₹62,000 Lowest | 65,000 ₹65,000 | 63,900 ₹63,900 |
| 5.00 | Providing & Fixing bearing at drive end No.NU-224 ECJ-C3 SKF make complete in all respect as per direction of Engineer-In-Charge.Sr. No. 48021A 402-11-06 | 1 | Each | 62,500 ₹62,500 Lowest | 1,12,500 ₹1,12,500 | 70,000 ₹70,000 |
| 6.00 | Reclamation of DE and NE side bearing,hosing including all leads and lifts complete in all respect as per the direction of Engineer In Charge. | 2 | Job | 30,500 ₹61,000 Lowest | 48,500 ₹97,000 | 35,000 ₹70,000 |
| 7.00 | Testing of motor on no load and full load condition including cable connection and commissioning of motor at site including all leads and lifts complete in all respect as per the direction of Engineer In Charge. | 2 | Job | 35,500 ₹71,000 Lowest | 40,000 ₹80,000 | 39,000 ₹78,000 |
| 8.00 | Installation of motor on bed and precision and longitudinal as well as axial allignment of motor with pump shaft with suitable precion measuring divices like dial gaguge stainless steel shims including manual and mechanical loading and unloading including all leads and lifts complete in all respect as per direction of Engineer In Charge. | 2 | Job | 40,000 ₹80,000 Lowest | 48,500 ₹97,000 | 41,800 ₹83,600 |
Tender Value
₹19.4 L
EMD Value
₹38,850
Closing Date
21 Aug 2026, 11:00 amClosed
AGM Bulk WSD SJPNL Us Club Shimla 171001
AGM Bulk WSD SJPNL Us Club Shimla 171001
Restoration of Rain damages of LWSS Shimla City from Ashwani Khad Koti Brandi) SH Improvement of Rotor and Stator of 11 KV indection motor BHEL Make 425 KW 550 HP having Sr No 48021A 402 11 06 at Kawalag Sr No 45026 A 402 11 02 at Ashwani
2026_SJPNL_140982_1
607-615 dated 10/08/2026
Open Tender
Pumps/Motors
Item Rate
90 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹38,850
17 Oct 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
11 Aug 2026 - 21 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Complete set rewinding of Stator of squirrel cage BHEL make 11KV motor 425KW/550 HP 2968 RPM, 50H/Z, 3 phase Induction motor having Sr. No. 48021A 402-11-06 at Kawalag & Sr. No. 45026A 402-11-02 at Ashwani Khad including cost of winding,insulation material, removing of old winding and rewinding with new winding material and allied jobs/material including all leads and lifts as per the direction of Engineer In Charge. | 2 | Job | - | - |
| 2 | Complete set rewinding of Rotor of squirrel cage BHEL make 11KV motor 425KW/550 HP 2968 RPM, 50H/Z, 3 phase Induction motor having Sr. No. 48021A 402-11-06 at Kawalag including cost of winding,insulation material, removing of old winding and rewinding with new winding material and allied jobs/material including all leads and lifts as per the direction of Engineer In Charge. | 1 | Job | - | - |
| 3 | Providing & Fixing bearing at drive end No.NU-228 ECG-C3 SKF make complete in all respect as per direction of Engineer-In-Charge.Sr. No. 48021A 402-11-06 | 1 | Each | - | - |
| 4 | Providing & Fixing Bearing at drive end No.6228- MA/C3 SKF make complete in all respect as per direction of Engineer In Charge Sr. No. 48021A 402-11-06 | 1 | Each | - | - |
| 5 | Providing & Fixing bearing at drive end No.NU-224 ECJ-C3 SKF make complete in all respect as per direction of Engineer-In-Charge.Sr. No. 48021A 402-11-06 | 1 | Each | - | - |
| 6 | Reclamation of DE and NE side bearing,hosing including all leads and lifts complete in all respect as per the direction of Engineer In Charge. | 2 | Job | - | - |
| 7 | Testing of motor on no load and full load condition including cable connection and commissioning of motor at site including all leads and lifts complete in all respect as per the direction of Engineer In Charge. | 2 | Job | - | - |
| 8 | Installation of motor on bed and precision and longitudinal as well as axial allignment of motor with pump shaft with suitable precion measuring divices like dial gaguge stainless steel shims including manual and mechanical loading and unloading including all leads and lifts complete in all respect as per direction of Engineer In Charge. | 2 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Tc.pdf
Tender Documents • 0.34 MB
From6.pdf
Tender Documents • 4.09 MB
From8.pdf
Tender Documents • 1.92 MB
Undertaking.pdf
Tender Documents • 0.04 MB
BOQ_209246.xls
BOQ • 0.28 MB
NIT.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .