| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC accepted |
| 2 | L2₹1.5 L+₹34.88 (0.02%)Rejected-AOC | ₹1.5 L+₹34.88 (0.02%) | L2 | Rejected-AOC accepted |
| 3 | L3₹1.7 L+₹17,475.55 (11.8%)Rejected-AOC | ₹1.7 L+₹17,475.55 (11.8%) | L3 | Rejected-AOC accepted |
| 4 | L3₹1.7 L+₹17,475.55 (11.8%)Rejected-AOC | ₹1.7 L+₹17,475.55 (11.8%) | L3 | Rejected-AOC accepted |
Tender Value
₹1.8 L
EMD Value
₹2,000
Closing Date
13 Jul 2026, 3:00 pmClosed
THE ZONAL OFFICER
THE ZONAL OFFICER
Providing HUME Pipe at Rail nagar for Rain water Draining in Unit 20, Division-93, Zone 7
2026_CoC_683795_1
Z.O.VII.C.NO.E1/3429/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2,000
25 Aug 2026
3 Jul 2026
14 Jul 2026
3 Jul 2026
13 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 40 | CUM | 368.55 | ₹14,742 |
| 2 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means | 1 | CUM | 5,756.01 | ₹5,756.01 |
| 3 | Brick work in following Cement Mortar using best q...Executive Engineer in charge. In Cement Morter 1:5 | 3 | CUM | 7,935.89 | ₹23,807.67 |
| 4 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 12 | SQM | 317.59 | ₹3,811.08 |
| 5 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 3 | SQM | 756.34 | ₹2,269.02 |
| 6 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 60 | KGS | 98.7 | ₹5,922 |
| 7 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 0.5 | CUM | 8,197.92 | ₹4,098.96 |
| 8 | Supplying, Delivering and Fixing of 600mm Dia RCC Hume Pipe | 30 | MTR | 3,800 | ₹1,14,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
TENDERDOCUMEN.pdf
Tender Documents • 1.43 MB
BOQ_821967.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .