Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹25,000
Closing Date
27 Mar 2024, 4:00 pmClosed
Executive Engineer
Executive Engineer Jal Shakti PHE Division Akhnoor
Annual Rate contract for repair of HC pumps, Booster and submersible motors, submersible pumps, submersible pump V6 installed at various Tube wells Dug wells in Jal Shakti PHE Division Akhnoor
2024_PHE_247590_5
ENIT 83
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
10 days
Akhnoor
as per ENIT
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti PHE Division Akhnoor
₹25,000
Yes
12 Apr 2024
18 Mar 2024
28 Mar 2024
18 Mar 2024
27 Mar 2024
18 Mar 2024
Amount
RKB make HC Pumps
Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor.
Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.
for head load distance 0 to 1 kms.
for head load distance 1-3 kms
for head load distance >3 kms
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 satge))
Repairing of pump shaft by jointing welding & turning to bearing size (Beyond 10 stage)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (3 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (4 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (5 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (6 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (7 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (8 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (9 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (10 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (12 Stage Pump)
Providing, Fabrication & fitting of new pump shaft as per size and specification. (14 Stage Pump)
Providing and fitting of Brass Impeller as per sample.
Providing and fitting of C.I Impeller as per sample.
Repairing of brass Impeller
Repairing of C.I Impeller
Fabrication & fitting of neck ring.
Fabrication & fitting of diffuser bush
Fabrication & fitting of Stainless steel shaft sleeves
Fabrication & fitting of chuck nut
Providing & Fitting of pump body casing
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing & fitting of bearing housing along with side cover plate
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Providing & fitting of diffuser
Providing & Fitting of Oil seal
Replacement of ball thrust bearing-7307
Replacement of ball thrust bearing-7308
Replacement of ball thrust bearing-7309
Replacement of Roller bearing-N-307
Replacement of Roller bearing-N-308
Replacement of Roller bearing-N-309
Providing & Fitting Coupling bolts nuts & rubber bushes.
Providing & fitting of gland plates along with studs.
Fabrication & fitting of tie rod bolts.
Dismantling & fitting of Pump ( 3 stage to 5 stage)
Dismantling & fitting of Pump ( 6 stage to 10 stage)
Dismantling & fitting of Pump ( Beyond 10 stage)
Providing and fitting of heavy duty coupling pulley set ( 5 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 6 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 7 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 8 inch dia.)
FNC Make HC Pumps
Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor.
Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.
for head load distance 0 to 1 kms.
for head load distance 1-3 kms
for head load distance >3 kms
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification (3 Stage)
Fabrication & fitting of new pump shaft as per size and specification (4 Stage)
Fabrication & fitting of new pump shaft as per size and specification (5 Stage)
Fabrication & fitting of new pump shaft as per size and specification (6 Stage)
Fabrication & fitting of new pump shaft as per size and specification (7 Stage)
Fabrication & fitting of new pump shaft as per size and specification (8 Stage)
Fabrication & fitting of new pump shaft as per size and specification (9 Stage)
Fabrication & fitting of new pump shaft as per size and specification (10 Stage)
Fabrication & fitting of new pump shaft as per size and specification (12 Stage)
Fabrication & fitting of new pump shaft as per size and specification (14 Stage)
Providing and fitting of Brass Impeller as per sample.
Providing and fitting of C.I Impeller as per sample.
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of body bushes.
Fabrication & fitting of Stainless steel shaft sleeves.
Fabrication & fitting of chuck nut
Providing & Fitting of pump body casing.
Repair to bearing housing by sleeve fitting & boring for bearing size
Fabrication & fitting of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of Roller bearing-N-204
Replacement of Roller bearing-N-205
Providing and fitting of diffuser.
Providing and fitting of thrust plate.
Providing & Fitting of Oil seal
Fabrication & fitting of gland plate with studs.
Providing & Fitting Coupling bolts nuts & rubber bushes.
Fabrication & fitting of tie rod bolts.
Providing & Fitting of stuffing box.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing and fitting of heavy duty coupling pulley set ( 5 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 6 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 7 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 8 inch dia.)
KSB Make HC Pumps
Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor.
Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.
for head load distance 0 to 1 kms.
for head load distance 1-3 kms
for head load distance >3 kms
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification. ( 3 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 4 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 5 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 6 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 7 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 8 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 9 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 10 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 12 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 14 stage pump)
Providing and fitting of Brass Impeller as per sample
Providing and fitting of C.I Impeller as per sample
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication & fitting of Stainless steel shaft sleeves
Fabrication & fitting of chuck nut
Providing & Fitting of pump body casing
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing & fitting of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of bearing 208 K with sleeve H 308.
Replacement of bearing 307 with sleeve H 307.
Replacement of ball thrust bearing 6403
Replacement of ball thrust bearing 6404
Replacement of ball thrust bearing 6405
Replacement of ball thrust bearing 6406
Providing and fitting of diffuser.
Fabrication & fitting of thrust plate
Providing & Fitting of Oil seal
Providing & Fitting Coupling bolts nuts & rubber bushes.
Fabrication & fitting of gland plate with studs.
Providing & fitting of stuffing box
Providing & fitting of tie rod bolts.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing and fitting of heavy duty coupling pulley set ( 5 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 6 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 7 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 8 inch dia.)
Mather Platt make HC Pumps
Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor.
Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.
for head load distance 0 to 1 kms.
for head load distance 1-3 kms
for head load distance >3 kms
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification. ( 3 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 4 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 5 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 6 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 7 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 8 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 9 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 10 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 11 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 12 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 14 stage pump)
Providing and fitting of Brass Impeller as per sample
Providing and fitting of C.I Impeller as per sample
Repairing of brass Impeller.
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication & fitting of Stainless steel shaft sleeves.
Fabrication & fitting of chuck nut
Providing & Fitting of pump body casing
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing & fitting of bearing housing along with side cover plates
Providing & fitting of brass bush
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of bearing 306 Nu.
Replacement of bearing 307 Nu.
Replacement of bearing 6306.
Providing and fitting of diffuser.
Fabrication & fitting of thrust plate
Providing & Fitting of Oil seal
Fabrication & fitting of gland plate with studs.
Providing & fitting of stuffing box
Providing & fitting of tie rod bolts.
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing and fitting of heavy duty coupling pulley set ( 5 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 6 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 7 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 8 inch dia.)
Low Speed HC Pumps
Decoupling of pump from motor, checking for damage, minor repairs to be done at site if required and recoupling of repaired pump with motor, checking of realignment of pump and motor.
Manual carriage of the pump wherever required to the nearest roadside and loading into mechanical transport for carrage to workshop and back manual carrage of repaired pump from nearest roadside to the pumping station.
for head load distance 0 to 1 kms.
for head load distance 1-3 kms
for head load distance >3 kms
Repairing of pump shaft by jointing welding & turning to bearing size (upto to 5 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (6 stage to 10 stage)
Repairing of pump shaft by jointing welding & turning to bearing size (beyond 10 stage)
Fabrication & fitting of new pump shaft as per size and specification. ( 3 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 4 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 5 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 6 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 7 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 8 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 9 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 10 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 11 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 12 stage pump)
Fabrication & fitting of new pump shaft as per size and specification. ( 14 stage pump)
Providing and fitting of C.I Impeller as per sample
Repairing of C.I Impeller.
Fabrication & fitting of neck ring.
Fabrication & fitting of spacer bushes.
Fabrication & fitting of guide bush
Fabrication & fitting of chuck nut
Providing & Fitting of pump body casing
Repair to bearing housing by sleeve fitting & boring for bearing size
Providing & fitting of bearing housing along with side cover plates
Providing and fitting of Delivery Body
Providing and fitting of Suction Body
Replacement of bearing Nu 208 K (Sleeve)
Replacement of bearing 6408.
Replacement of bearing 6306.
Providing and fitting of diffuser.
Fabrication & fitting of thrust plate
Providing & Fitting of Oil seal
Fabrication & fitting of gland plate with studs.
Providing & fitting of stuffing box
Providing & fitting of tie rod bolts.
Providing & Fitting Coupling bolts nuts & rubber bushes.
Dismantling & fitting of Pump (3 stage to 5 stage)
Dismantling & fitting of Pump (6 stage to 10 stage)
Dismantling & fitting of Pump (Beyond 10 stage)
Providing and fitting of heavy duty coupling pulley set ( 5 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 6 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 7 inch dia.)
Providing and fitting of heavy duty coupling pulley set ( 8 inch dia.)
Providing of Adaptor for V-6 Submersible motor
Providing of Adaptor for V-8 Submersible motor
Fabrication & providing of MS Clamp 3"
Fabrication & providing of MS Clamp 4"
Fabrication & providing of MS Shling for Gantry Post
Fabrication & providing of 80 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 65 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 125 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 150 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 100 mm dia. flanged adaptor with threading at other side
Fabrication & providing of 50 mm dia. flanged adaptor with threading at other side
Repairing of Submersible Pump (V-4)
Fabrication/Providing of Coupling pulley with cotter for V-4 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft as per specification.
Fabrication/Providing of New Impeller
Fabrication/Providing of New PVC A-Grade Impeller with body set
Repair to impeller
Fabrication/Providing of Neck Ring
Fabrication/Providing of Body Bushes
Fabrication/Providing of Guide Bush
Fabrication/Providing of Spacer Bush
Fabrication/Providing of Cotter
Providing and fitting of body cover as per specification
Fabrication/Providing of Pump Body
Fabrication/Providing of Suction Body
fabrication & fitting of suction body bushes.
Labour Charges for dismantling and fitting of pump
Repairing of Submersible Pump (V-8)
Providing of Coupling pulley with cotter for V-8 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft as per specification.
Fabrication of Neck Ring
Fabrication/Providing of New Impeller
Repair to impeller
Fabrication of Body Bushes
Fabrication of Guide Bush
Fabrication of Spacer Bush
Providing of Cotter
Fabrication of Pump Body
Providing of Suction Body
Providing of NRV with adaptor
Labour Charges for dismantling and fitting of pump
Repairing of Submersible Pump (V-6)
Providing of Coupling pulley with cotter for V-6 Submersible motor
Repairing of pump shaft by welding, turning, polishing and making key ways.
Fabrication of pump shaft as per specification (upto 5 stage)
Fabrication of pump shaft as per specification (6 stage to 10 stage)
Fabrication of pump shaft as per specification (11 stage to 15 stage)
Fabrication of pump shaft as per specification (16 stage to 20 stage)
Fabrication of pump shaft as per specification (beyond 20 stage)
Fabrication/Providing of New Impeller
Fabrication/Providing of New PVC A-Grade Impeller
Repair to impeller
Fabrication/Providing of Neck Ring
Fabrication/Providing of Body Bushes
Fabrication/Providing of Guide Bush
Fabrication/Providing of Spacer Bush
Fabrication/Providing of Cotter
Fabrication/Providing of Pump Body
Fabrication/Providing of Suction Body
Providing & fitting of suction body bush.
Labour charges for Dismantling & fitting of Pump (upto 5 stage)
Labour charges fo Dismantling & fitting of Pump (6 stage to 10 stage)
Labour charges fo Dismantling & fitting of Pump (11 stage to 15 stage)
Labour charges fo Dismantling & fitting of Pump (Beyond 15 stage)
Providing and fitting of copper Submersible cable 3core along with Thimbles.
2.5 sq. mm /mtr.
4 sq. mm /mtr.
6 sq. mm /mtr.
10 sq. mm/mtr.
16 sq. mm/mtr.
Mono Submersible pumps
Fabrication / fitting of neck ring.
Providing & fitting of New Impeller of brass.
Providing & fitting of New Impeller of C. I
Repair of the exisitng impeller of brass
Repair of the exisitng impeller of C.I
Providing and fitting of body casing.
Providing and fitting of pump cover NDE.
Booster & Submersible motors
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to submersible motor (V-8) by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set. Repairs to thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair to submersible Motor (V-6) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repair to submersible Motor (V-8) by extraction of broken copper strips from rotor than P/F of new copper strips (01 No.)& welding of the rotor, turning & finishing. Also repair to rotor end by rebuilding, turning & finishing.
Repairs to V-6 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by rotor shaft turning & polishing, Fabrication & fitting of bushes in bush housing-2set.Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-6 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repairs to V-8 submersible motor by way of P/F of thrust pad 01 set. P/F of Stud with nuts in place of damaged studs as per requirement, Circlip lock-2nos, Fitting of motor &coupled with pump & testing in the test pit.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 25 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 40 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 50 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 60 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 70 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 100 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair to 25 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 40 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 50 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 60 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 100 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at DE and NDE & then assembling of motor.
Repair 75 HP Induction Motor by way of rotor shaft welding and turning and sleeve to end covers with replacement of bearing at one end & then assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at DE & NDE and assembling of motor.
Repair to 75 HP motor by way of replacement of bearing at one end and assembling of motor.
Repair 2 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 3 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 5 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 7 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 8 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Repair 10 HP Motor of monosubmersible pump by way of rotor shaft welding and turning and sleeve to end covers & then assembling of motor.
Flanging of 50 mm Column pipe (Single side)
Flanging of 65 mm Column pipe (Single side)
Flanging of 80 mm Column pipe (Single side)
Flanging of 100 mm Column pipe (Single side)
Flanging of 150 mm Column pipe (Single side)
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS
PARVEEN ENGINEERING WORKS
trikuta mech. and elect. works
VK Mechanical Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .