| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | -23.00% | ₹8.5 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 L+₹44,108.53 (5.21%)Admitted-Finance | -18.99% | ₹8.9 L+₹44,108.53 (5.21%) | L2 | Admitted-Finance |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
23 May 2026, 6:00 pmClosed
ADPC SMSA BIKANER
KOTHI NO 3 HANUMANHATHA BIKANER
AS PER NIT
2026_RCSCE_560418_1
ADPC/SMSA/BKN/CIVIL/1693 DATE 14-05-2026
Open Tender
Civil Works
Percentage
90 days
BIKANER
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
ADPC SMSA MD RISL
₹22,000
2 Jun 2026
19 May 2026
25 May 2026
19 May 2026
23 May 2026
19 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART-A | |||||
| 1.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 152.6 | cum | 573.3 | ₹87,485.58 |
| 1.02 | Demolishing lime concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer-in-charge. | 152.6 | cum | 228.6 | ₹34,884.36 |
| 1.03 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 146.86 | SQM | 72 | ₹10,573.92 |
| 1.04 | Grading roof for water proofing treatment with water proffing compound Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 156.19 | cum | 4,034.7 | ₹6,30,179.79 |
| 1.05 | Stone slab roofing on ground floor with fine grained stone slab from approved quarry including filling of joints of parapet and slab on both sides in cement sand mortar 1:4, with ceiling pointing in cement sand mortar 1 : 3 complete as per specification and instruction of Engineer In Charge | 146.86 | SQM | 1,483.2 | ₹2,17,822.75 |
| 1.06 | Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 180 | MTR | 99.9 | ₹17,982 |
| 1.07 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding: Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. | 482 | SQM | 72 | ₹34,704 |
| 1.08 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 12.91 | cum | 4,491 | ₹57,978.81 |
| 1.09 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand) : Flush / Ruled/ Struck or weathered pointing. | 116 | SQM | 72 | ₹8,352 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_997538.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .