Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC B 4 KALKA GARHI HANS PLAZA AMBEDKAR ROAD VILLAGE TOWN GHAZIABAD CITY GHAZIABAD GHAZIABAD UTTAR PRADESH 201001 INDIA | GHAZIABAD | UTTAR PRADESH | 201001 | ₹6.7 Cr | L1 | Accepted-AOC The bidder is L1 bidder |
| 2 | L2₹6.7 Cr+₹1.2 L (0.18%)Rejected-Finance 103 DIAMOND PLAZA B H NILAM SHOPPING CENTRE DIAMOND STREET BOTAD GUJARAT 364710 | BOTAD | GUJARAT | 364710 | ₹6.7 Cr+₹1.2 L (0.18%) | L2 | Rejected-Finance Not the lowest. |
| 3 | L3₹6.9 Cr+₹22.4 L (3.35%)Rejected-Finance | ₹6.9 Cr+₹22.4 L (3.35%) | L3 | Rejected-Finance Not the lowest. |
| 4 | L4₹7.2 Cr+₹54.3 L (8.12%)Rejected-Finance | ₹7.2 Cr+₹54.3 L (8.12%) | L4 | Rejected-Finance Not the lowest. |
| 5 | L5₹7.9 Cr+₹1.2 Cr (18.6%)Rejected-Finance 245 2 RAJPUR ROAD OPPOSITE HOTEL MADHUBAN DEHRADUN | ₹7.9 Cr+₹1.2 Cr (18.6%) | L5 | Rejected-Finance Not the lowest. |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
14 Jan 2026, 11:00 amClosed
GM (MnC)
Mumbai Marketing HO
Installation testing and commissioining of electrical and allied civil structural works for the LOBS co terminus project at IOCL marketing complex panipat
2025_MKTHO_188086_1
MnC/LUB-37/PT-118/25-26
Open Tender
Electrical Works
Tender cum Auction
240 days
Panipat Refinery
As per tender document
4 documents required · 4 mandatory
₹1.7 L
Yes
Though VC
2 Mar 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
14 Jan 2026
6 Jan 2026
24 Dec 2025 - 31 Dec 2025
31 Dec 2025
Select, At Par, Excess (+), Less (-) IOCL Select Not Quoted At Par Excess (+) Less (-)
Tender Inviting Authority : GENERAL MANAGER (MATERIAL & CONTRACTS),MARKETING DIVISION, HEAD OFFICE, MUMBAI
Name of Work: Supply, Installation, Testing and Commissioning of Electrical and allied civil/ structural Works for the LOBS Co-Terminus Project at IOCL Marketing Complex, Panipat
Tender No : Mnc/LUB-37/PT-118/25-26 (E-Tender ID: 2025_MKTHO_188086_1)
APPLICABLE INPUT TAX CREDITS ON GST COMPONENTS
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Amount excluding GST(Rs.) Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Bidder to indicate applicable GST rate in percentage (%) Bidder to indicate applicable HSN/SAC code Applicable GST Amount on unit rate as per Bidder's Quoted GST % (Rs.) Applicable ITC amount on unit rate (Rs.) Item rate including GST net of ITC in (Rs) TOTAL AMOUNT (NET OF ITC) in Rs. P TOTAL AMOUNT (NET OF ITC) in Rs. P TOTAL AMOUNT In Words
10 Supply, Installation, Testing and Commissioning of Electrical and allied civil/ structural Works for the LOBS Co-Terminus Project at IOCL Marketing Complex, Panipat 30 1 SU 57182214.25 Excess(+) Full Conversion INR INR Five Crore Seventy One Lakh Eighty Two Thousand Two Hundred & Fourteen and Paise Twenty Five Only
Total in Figures INR Five Crore Seventy One Lakh Eighty Two Thousand Two Hundred & Fourteen and Paise Twenty Five Only 4 Construction of chamber for 100mm sluice plates item5 10 Nos
1. Bidders may quote above(+) /below(-)/At par (0) considering all items of SOR in appropriate box. Bidders intending to quote 'AT PAR' must quote '0' (zero) in the box at the bottom (At " Quoted rate in figures"). 2. Bidder should quote their rate by selecting Less (-) or Excess(+) in the Drop Down Box and thereafter filling the Percentage rate in figures (maximum two digits after decimal) only without any condition. 3. The acceptable quoted rate by bidder shall be applicable uniformly on all the items of SOR attached in Technical Bid as annexure. 4.Before filling the rates in price bid, the tenderers must visit the site at their own cost and study complete tender document including detailed scope of work, description / specification of each items, relevant works & logistics of the area. 5. Please note if a bidder opts for " NOT QUOTED " his bid will not be considered. 6.The work order along with Schedule of Rate shall be placed on the successful tenderer as per attached SOR with applicable surcharge/discount . 7.The detailed SOR (Schedule of Rate ) is attached with tender document. The quoted % rate in BOQ (Price bid) shall be uniformly applicable for all items of the SOR. 8. The corporation shall be within its right to execute or not to execute or to partially execute or exceed any of the items as mentioned in the schedule of items and rates. 9. The party has to enter Bidder's name , Percentage Quote and applicable GST Rate in Percentage , in the designated cells.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Part_A.pdf
Tender Documents • 2.03 MB
Tender-Acceptance-Format.pdf
Additional Documents • 0.08 MB
Part_B.pdf
Additional Documents • 1.71 MB
39_GCCwithAppendix.pdf
Additional Documents • 1.04 MB
40_OISD_GDN_192.pdf
Additional Documents • 3.63 MB
41_Civil_Specifications.pdf
Additional Documents • 18.90 MB
HO_CivilSpecification_2023.pdf
Additional Documents • 18.90 MB
SOR_Electrical.pdf
Additional Documents • 0.37 MB
BOQ_198359.xls
BOQ • 1.63 MB
ELECTRICAL_SPEC.pdf
Additional Documents • 38.08 MB
FAQs-IOCL-Online-EMD.pdf
Additional Documents • 0.55 MB
Bidders_help_Document_for_Preferencial_Bidding_20230207_v1.pdf
Additional Documents • 0.82 MB
Special_Instructions_to_the_Bidders_Version_5_dated_30_June_2025.pdf
Additional Documents • 2.80 MB
Safety_Policy_for_Contract_Workers.pdf
Additional Documents • 2.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .