Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance T P ROAD DURGAMANDIR ASANSOL BARDHAMAN 713303 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713303 | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 L+₹7,764 (3.45%)Admitted-Finance | ₹2.3 L+₹7,764 (3.45%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical as per approved TCR |
| Sl No | Description | Qty | Unit | Chatterjee Engineering Works L2 | META ELECTRIC L1 |
|---|---|---|---|---|---|
| 1.00Complete repairing/rewinding of 250KVA,3.3KV/440V domestic transformer of A B Block domestic colony of Ningha Colliery under Satgram-Sripur Area | |||||
| 1.01 | Dismantling of core & winding from tank | 1 | AU | 1,650 ₹1,650 | 1,450 ₹1,450 Lowest |
| 1.02 | Cost of new electrolyte grade copper bare wire/strips for primary coils | 198 | KG | 876 ₹1,73,448 Lowest | 876 ₹1,73,448 Lowest |
| 1.03 | Cost of new electrolyte grade copper bare wire/strips for secondary coil | 162 | KG | 876 ₹1,41,912 Lowest | 876 ₹1,41,912 Lowest |
| 1.04 | Insulation of materials for formation of primary coil | 1 | AU | 3,800 ₹3,800 | 3,400 ₹3,400 Lowest |
| 1.05 | Insulation of materials for formation of secandary coll | 1 | AU | 3,800 ₹3,800 | 3,400 ₹3,400 Lowest |
| 1.06 | Supply and fitting of teminal busing with current carrying contact for primary teminals | 7 | AU | 1,400 ₹9,800 | 1,135 ₹7,945 Lowest |
| 1.07 | Supply and fitting of teminal busing with current carrying contact for Secondary teminals | 7 | AU | 1,600 ₹11,200 | 1,340 ₹9,380 Lowest |
| 1.08 | Insulation materials for assembling core & winding | 1 | AU | 3,000 ₹3,000 | 2,500 ₹2,500 Lowest |
| 1.09 | Charges for detaking and assembling | 1 | KG | 3,600 ₹3,600 | 3,490 ₹3,490 Lowest |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
20 Aug 2026, 4:00 pmClosed
General Manager
Office of The General Manager,SSA
Complete repairing/rewinding of 250KVA,3.3KV/440V domestic transformer of A B Block domestic colony of Ningha Colliery under Satgram-Sripur Area
2026_ECL_363423_1
ECL /SSA/ GM/ EM/ E-NIT/ 2026-27 /15 date 07.08.2026
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Nigha Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,400
3 Sept 2026
10 Aug 2026
21 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
10 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Complete repairing/rewinding of 250KVA,3.3KV/440V domestic transformer of A B Block domestic colony of Ningha Colliery under Satgram-Sripur Area | |||||
| 1.01 | Dismantling of core & winding from tank | 1 | AU | 1,450 | ₹1,450 |
| 1.02 | Cost of new electrolyte grade copper bare wire/strips for primary coils | 198 | KG | 876 | ₹1,73,448 |
| 1.03 | Cost of new electrolyte grade copper bare wire/strips for secondary coil | 162 | KG | 876 | ₹1,41,912 |
| 1.04 | Insulation of materials for formation of primary coil | 1 | AU | 3,400 | ₹3,400 |
| 1.05 | Insulation of materials for formation of secandary coll | 1 | AU | 3,400 | ₹3,400 |
| 1.06 | Supply and fitting of teminal busing with current carrying contact for primary teminals | 7 | AU | 1,135 | ₹7,945 |
| 1.07 | Supply and fitting of teminal busing with current carrying contact for Secondary teminals | 7 | AU | 1,340 | ₹9,380 |
| 1.08 | Insulation materials for assembling core & winding | 1 | AU | 2,500 | ₹2,500 |
| 1.09 | Charges for detaking and assembling | 1 | KG | 3,490 | ₹3,490 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Tendernotice_2.pdf
PDF • 1.24 MB
BOQ_376350.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .