Strengthening of 1 Roads in Olakkur Panchayat Union in Viluppuram District under SCPAR Roads 2020-21 Package TNVPM/SCPAR20-21/020
2021_RDTN_193050_1
TNVPM/SCPAR/2021-020
Open Tender
Civil Works
Works
180 days
Viluppuram District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹24,000
Yes
26 Feb 2021
31 Jan 2021
15 Feb 2021
31 Jan 2021
15 Feb 2021
4 Feb 2021
Amount
Strengthening the BT konalur Road Km-0/0-1/0
Clearing the scrub jungles including all labour charges for all labour charges etc completeKm-0/0-1/0
Earthwork excavation and deposting on bank eith an intial lead and lift in hard gravelly soil for cutting side drain etc complete as per SS 20A .Km-0/0-1/0
Picking the existing BT surface upto5cmto 10cm thickness and sectioningthe road
laying us Gravel including cost and conveyance and stacking at site to departmental gauge for taking pre measurements by departmental officers and including labour charges for spreading the gravel as per standard specificiation etc complete
Providing and laying spreading and compactng graded stone aggregate to Wet Mix Macadam (WMM) specification incluing premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in sub base/base course on well prepared surface and compacting with virating roller to achieve the desired density including cost of material, labour charges, tentals for machinery, fuel and other incidential charges etc., complete.
Applying prime coat over WMB/WMM surface using 7.0 kg of bituminous emulsion (SS-1)per 10 sqm including cost and conveyance of bituminous emulsion which will be supplied by deptly at section store and cost of which will be recovered at the rates as per special condittion appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc, complete as per clause 503 of MOST specification
Applying tack coat over primed WBM surface using 2.5 kg of bituminous emulsion (RS-1) per 10 sqm including cost and conveyance of bituminous emulsion which will be supplied by deptly at section store and cost of which will be recovered at the rates as per special condittion appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc, complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat type "A" for 20 MM consolidated thickness using IRC size machine broken HBG metal of 0.18 cubic metre of 13.2 MM and 0.09 cubic metre of 11.2 MM with 14.6 kg of 60/70 grade bitumen for pre mixing for 10 sqm of pre mix carpet and 0.09 cubic metre of 6.7 MM IRC size HBG crusher chips with 9.8 kg of 60/70 grade bitumen for 10 sqm for seal coat incuding cost and coveyance of the materials from the approved sources to work sites and stacking them at road sites to departmental gauge for premeasurment including cost of 60/70 grade bitumen which will be supplied from departmental section stores and the cost which will be revcovered at the rates specified in the special conditions appended herewith and including conveyance of bitumen to work spot, handling charges for the same at both ends including labour charges for heating the bitumen to the required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow and including labour charges for spreading the mix to grades, lines and profiles consolidating with including hire charges, fuel charges and running charges for mini hot mix plant power roller and all other tools and plants employed and all other incidental charges such as barricading and caution boards, danger lights etc. complete ( payment shall be made for the finished item of works after compaction )
Provision for KM stone
Provision for HM stone
Provision for the Name board
Provsion of Photo graph charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Vijayan R
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .