| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.5 L
EMD Value
₹84,595
Closing Date
30 Jul 2026, 3:00 pmClosed
CE KNN
CE KNN MOTI JHEEL
Construction by drain from Madan Verma To Sita Ram House in Gopal Nagar ward 46 zone 2.
2026_NNKAN_1146587_2
33/AA-2/26-27
Open Tender
Civil Works
Fixed-rate
45 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹84,595
21 Sept 2026
27 Jul 2026
30 Jul 2026
27 Jul 2026
30 Jul 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Cutting or Embankment in foundation and under plinth in ordinary soil including lift 1.5 m and lead 30m by direction of E/I and Cartage earth upto 3Km etc all complete. | 108 | cum | 125 | ₹13,500 |
| 2 | Earth work in execavation in foundation and under plinth area lift 1.5 m lead 30m with all charges complete. | 45.9 | cum | 170 | ₹7,803 |
| 3 | Providing and Laying of P.C.C. 1:6:12 Cement, C.Sand and 40 mm gauge brick ballast etc all complete. | - | cum | 4,380 | - |
| 4 | Class 150 brickwork in 1:4 Cement, C.sand in foundation and plinth etc all complete. | 34.02 | sqm | 6,600 | ₹2,24,532 |
| 5 | 12mm thick plaster of mix 1:4 Cement coarse sand etc all complete. | 234 | cum | 200 | ₹46,800 |
| 6 | Reinforcement cement concrete work in 1:1. 5:3 grade excluding cost of centering, shuttering and finishing and reinforcement(all works upto plinth level) 5.1.2 | - | cum | 8,720 | - |
| 7 | Mild steel or iron work in plain worksuch as reinforced concrete to required shape as necessary including binding for proper completion of work. | 1 | qtl | 7,200 | ₹7,199.93 |
| 8 | construction of granual sub base (GSB) with well graded materails in uniform layer etc all complete. | 21.6 | cum | 3,671 | ₹79,293.6 |
| 9 | Supply and laying of 80mm thick rubber moulded interlocking tiles with local sand 25-40 mm thick etc all complete. | - | sqm | 925 | - |
| 10 | Disposal of surplus earth/malwa up to 3.00 Km etc all complete. | 1 | cum | 116.96 | ₹116.96 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.66 MB
BOQ_2202266.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .