Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-Finance | ₹2.8 L | L1 | Accepted-Finance Due to L1 Bidder (SC) |
| 2 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance Due to L2 Bidder |
| 3 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance Due to L2 Bidder |
| 4 | L2₹3.3 LRejected-Finance | ₹3.3 L | L2 | Rejected-Finance Due to L2 Bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical GSTIN showing Cancelled |
Tender Value
₹3.3 L
EMD Value
₹3,300
Closing Date
22 May 2026, 5:30 pmClosed
SE,HARABHANGI IRRI DIVN
O/O SE,HARABHANGI IRRI DIVN
DESILTING OF CANAL
2026_CEBMB_128949_1
SE-HID-ADV-02/2026-27
National Competitive Bid
Civil Works - Others
30 days
ADAVA
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
₹3,300
Yes
6 Jun 2026
11 May 2026
25 May 2026
11 May 2026
22 May 2026
11 May 2026
11 May 2026 - 13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation from canal bed in ordinary soil with all leads, lifts & delifts including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth and levelling the bed and slope and deposited the earth away from the working area etc. with all labour charges, T & P charges and CESS etc. Complete as per direction of Engineer-In-Charge. Measurement will be taken on finished level section. | - | Cum | 171.7 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in excavation of all kinds of soil (Hard soil) by manual means/mechanical means with all leads, lifts & delifts including leveling and dressing the canal bed upto design bed level and depositing the excavated earth away from the working area including breaking clods maximum 5cm to 7cm in size and laying in layers not exceeding 0.30mtr. in depth including bailing out water and dewatering if required etc.with all labour charges, T & P charges and CESS etc complete as per direction of Engineer-In-Charge Measurement will be taken on finished level section. | 280.5 | Cum | 230.7 | ₹64,711.35 | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_590138.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TECHNICAL05.pdf
Tender Documents • 1.92 MB
BOQ_590138.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid