Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.6 LAdmitted-Finance | -1.51% | ₹32.6 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Technical Bid Fail |
Tender Value
₹33.1 L
EMD Value
₹66,133
Closing Date
11 Jun 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER WDSC, KAMAN
Construction of Farm pond S/F HDPE plastic film / geo membran for Farmpond lining 500 Micron ( BIS5351 /2015) sheet,RTWHS with recharge shaft PS Nagar
2026_WDSC_564244_1
NIT 03/2026-27/Nagar Deeg
Open Tender
Civil Works
Percentage
60 days
Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per Nit/Tender doc
₹66,133
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
11 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description | |||||
| 1.01 | Mkxcsfyax djuk 5 ls 7-5 lseh- xgjkbZ rd ¼vkbZVe u0 6 c ½ | - | eh- | 1.71 | - |
| 1.02 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. (Item No. 196B, GKN 2026) | - | cum | 55.43 | - |
| 1.03 | S/F HDPE plastic film / geo membran for Farmpond lining 500 Micron ( BIS5351 /2015) sheet | 1 | ?ku eh- | 118 | ₹117.88 |
| 1.04 | Labour charges of laying and spreading of LDPE/HDPE film of 250/500 micron on bed and sides including jointing etc.complete as per specification excluding cost of LDPE/HDPE and including cost of overlapping and cost of adhesive tape etc with transportation charges upto work site complete. | 1 | ?ku eh- | 32 | ₹31.97 |
| 1.05 | 150cm ऊंचाई की फेंसिंग लोहे का पोस्ट35X35X5mm के 3मी.दूरी से व 30cm जमीन में सीमेंटकंक्रीट 1:3:6(.30X.30X.60m)कोर्नर व प्रत्येक10वां पोस्ट को 35X35X5mm लोहेके पोस्ट से सपोर्ट करना,साथ में 4लाईनों में काला कांटेदारतार, 2पोस्ट के बीच जीआई. स्टेपल तार से बांधना व फिट करना सहित |विश्लेषण27 मी. लम्बाई फेंसिंग तक के लिए,मिट्टी खुदाई कार्य सहित(कंक्रीट 0.54 घमी.) | - | ?ku eh- | 294.37 | - |
| 1.06 | कोनिया लोहा (एंगल आईरन) के 40X40X3 मिमी की बाहरी चोखट में 22 गेज की सादा जी.आई. चद्दर के 2 पल्ले वाले दरवाजे 25X25X3 मिमी के कोनिया लोहे के चौखट (फ्रेम) में आपूर्ति करना तथा लगाना मय अर्गल स्लाईडिंग वोल्ट, चिटकनी तथा पकड़ पट्टियां आदि फिटिंग सहित एम.एस. चद्दर विश्लेषण 1X1.5 वर्गमीटर दरवाजे के लिए | - | ?ku eh- | 2,492.5 | - |
| 1.07 | Excavation including loading unloading disposal and dressing of Excavated earth with in initial lead of 50mtr and lift up to 1.50 mtr including dressing of excavated area dewatering wherever required complele in all respect, Hard / dense soil. (Excavation work to be Executed by machine) as per BSR on C.E.W.R.Dept. dist.Bharatpur, 2023 ,Chapter V, Part A,item no 1 page no 11. RATE 95-9.5 =85.50 (less 10% C.P). | 1 | ?ku eh- | 85.5 | ₹85.41 |
| 1.08 | Add extra over item no.2 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un-loading wherever required as per BSR on C.E.W.R.Dept. dist. Bharatpur, 2023 ,Part A,item no 11 page no 18, RATE 8.5-0.85 =7.65 (less 10% C.P). 1 LIFT | - | ?ku eh- | 7.65 | - |
| 1.09 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 40 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित। 1:4:8 (i) 40 एमएम क्रेशर ब्रोकन पत्थर की गिटटी के स्थान पर हाथ से टूटी हुई रोडी के उपयोग करने पर वही मात्रा देय होगी परन्तु गिटटी की दर में 30 प्रतिशत की कटौती की जावेगी।(ii) Vibratar and mixure का उपयोग नहीं करने पर 3% कटौती की जावे (As per GKN BSR -2025 item no 15(a)) | - | ?ku eh- | 3,753.45 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_1004184.xls
BOQ • 0.26 MB
tenderdoc.pdf
Tender Documents • 5.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].