Tender Value
₹20.3 L
EMD Value
₹40,667
Closing Date
28 Jul 2026, 1:00 pm3d left
Executive Engineer, KSHD, PWD
KIT Building, 2nd Floor, P-16, India Exchange Place Extension, Kolkata-700073
IPGMER-SSKM Hospital --- Construction of Oxygen Manifold for Ananyo Building under IPGMER-SSKM Hospital, Kolkata during the year 2026-2027.
2026_WBPWD_5016498_1
WBPWD/KSHD/EE/NIT-09 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
75 days
IPGMER-SSKM Hospital
Please refer Tender documents.
5 documents required · 5 mandatory
₹40,667
Yes
8 Jul 2026
8 Jul 2026
30 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | - | Sq.m | 10 | - |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In Ground floor including roof. (a) upto 150 mm. thick | - | Cu.m | 939 | - |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | - | % Cu.m | 11,927 | - |
| 3.01 | (b) Depth of excavation for additional depth beyond
1,500 mm. and upto 3,000 mm. but not requiring shoring. | 1 | %Cum. | 19,238 | ₹19,218.76 |
| 4 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (a) With earth obtained from excavation of foundation. | 1 | %Cum. | 7,754 | ₹7,746.25 |
| 5 | (A) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 1 | %Cum. | 93,621 | ₹93,527.38 |
| 6 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 1 | Sq.m | - | - |
| 7 | (I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion | 1 | Cu.m | 5,248.52 | ₹5,243.27 |
| 8 | Supplying ready mixed concrete of M 25 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier] In Ground Floor and Foundation (i) Without approved concrete pump | 1 | Cu.m | 7,298.47 | ₹7,291.17 |
| 9 | Supplying. preparing and placement of ready mix non shrink cementious microconcrete having no metalic aggregate or chlorides for repairing and jackting of damagedR.C.C.members. Themicro concrete should achieve a compressive strength not less than 10 MPa after 24 hours. 40 Mpaafter 7 days and 50Mpa aftre 28 days at 300C.It should have unrestrained expansion in between 1 to 4%. flexural strength shall not be less than 5MPa after 28 days. Micro concrete should have a co-efficient of thermal expansion similar to that of the host concrete. | - | Cu.m | 50,546 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
2911.pdf
Tender Documents • 0.89 MB
BOQ_5086020.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].