Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹8,820
Closing Date
8 Sept 2026, 4:00 pm
Er. Fayaz Ahmad Shiekh
Executive Engineer REW Ramban
As per NIT
2026_RDPR_322249_8
eNIT20.5 of REW Ramban Block Ramban under PRI/BDC/DDC/APDP of 2026-27
Open Tender
Civil Works
Percentage
30 days
Ramban
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Ramban
₹8,820
25 Aug 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. AKS | - | cum | 479.3 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 1 | cum | 5,733.6 | ₹5,727.87 |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone | 1 | cum | 2,793.8 | ₹2,791.01 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | - | sqm | 286.35 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | KG | 123.25 | - |
| 7 | Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade | 1 | Sqm | 127.95 | ₹127.82 |
| 8 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 1 | Sqm | 98.75 | ₹98.65 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete .25 mm thick with 20 mm nominal size stone aggregate. | 0.8 | sqm | 409.25 | ₹327.4 |
| 10 | providing and fixing 30 mm thick glazed shutter for windows and clearstory windows using 10kg/sqm (4mm thick) glass panes including black enamelled ISI marked M.S hinges with necessary screws. Second class kail wood | - | sqm | 2,597.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.09 MB
BOQ_1080025.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].