| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹3.2 Cr−₹21.3 L (6.30%)Accepted-AOC | ₹3.2 Cr−₹21.3 L (6.30%) | H2 | Accepted-AOC Awarded |
| 2 | H1₹3.4 CrRejected-AOC | ₹3.4 Cr | H1 | Rejected-AOC Not Awarded |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per Comparative Statement (Technical Bid) isNon - Responsive |
| Sl No | Description | Qty | Unit | Kaziranga Galvanizers Pvt Ltd H2 | PANKAJ BAKATIAL H1 |
|---|---|---|---|---|---|
| 1.00A. Civil Works (Total Area 900 sqm) | |||||
| 2.00 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 653.46 | cum | 487 ₹3,18,235.02 | 330 ₹2,15,641.8 Lowest |
| 3.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 28.22 | cum | 7,400 ₹2,08,813.2 Lowest | 7,858 ₹2,21,737.04 |
| 4.00 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 236.57 | cum | 1,800 ₹4,25,835 Lowest | 2,485 ₹5,87,888.88 |
| 5.00 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 60,309.27 | kg | 110 ₹66,34,019.59 | 103 ₹62,11,854.71 Lowest |
| 6.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 579.22 | sqm | 600 ₹3,47,532.6 | 354 ₹2,05,044.23 Lowest |
| 7.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.3 Suspended floors, roofs, landings, balconies and access platform | 785.69 | sqm | 830 ₹6,52,120.21 Lowest | 882 ₹6,92,975.93 |
| 8.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 952.47 | sqm | 660 ₹6,28,628.22 Lowest | 700 ₹6,66,726.9 |
| 9.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 496.31 | sqm | 890 ₹4,41,713.23 Lowest | 925 ₹4,59,083.98 |
| 10.00 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.7 Stairs, (excluding landings) except spiral-staircases | 109.49 | sqm | 800 ₹87,595.2 | 756 ₹82,777.46 Lowest |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
29 Sept 2025, 2:00 pmClosed
Managing Director
Office of the Managing Director, APTDC Ltd. Ganeshguri, Guwahati - 05
Administrative Approval for an amount of Rs. 316.24650 for construction of single storey new girls hostel No 12 at Jorhat Engineering College, Jorhat under SOPD ODS during the year 2023-24
2025_WPTBC_47363_1
PTDC/Engg/2024-25/369
Open Tender
Civil Works
Item Rate
270 days
Jorhat Engineering College
Please refer to tender document
3 documents required · 3 mandatory
₹3,200
₹6.3 L
Yes
Managing Director, APTDC Ltd., Ga
3 Sept 2026
8 Sept 2025
29 Sept 2025
10 Sept 2025
29 Sept 2025
10 Sept 2025
15 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. Civil Works (Total Area 900 sqm) | - | - | - | - |
| 2 | 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | - | cum | 286.85 | - |
| 3 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 6,833.4 | ₹6,826.57 |
| 4 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1 | cum | 2,161.2 | ₹2,159.04 |
| 5 | 5.22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.6 | kg | 89.65 | ₹53.79 |
| 6 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 0.4 | sqm | 307.95 | ₹123.18 |
| 7 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.3 Suspended floors, roofs, landings, balconies and access platform | 0.8 | sqm | 766.55 | ₹613.24 |
| 8 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 0.8 | sqm | 608.35 | ₹486.07 |
| 9 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 0.8 | sqm | 804.25 | ₹643.4 |
| 10 | 5.9 Centering and shuttering including strutting, propping etc. and removal of form for
5.9.7 Stairs, (excluding landings) except spiral-staircases | 0.6 | sqm | 657.75 | ₹393.99 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
DrawingJECGH12.pdf
Tender Documents • 1.00 MB
SBD.pdf
Tender Documents • 1.02 MB
BOQ_75606.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .