Loading…
Loading…
Tender Value
₹48.7 L
EMD Value
₹48,800
Closing Date
6 Jun 2026, 5:00 pmDue tomorrow
Executive Engineer,Div-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of RCC drain infront of Bana Durga Kinetic World, Infront of Sikhya Samrudhi Hostel, Infront of HUB Resturant, Infront of Lion Resturant, Infront of Pvt. Bus Association, Infront of Swad Resturant to Honda Show Room via OSL Tower w.no.37
2026_ORULB_128802_2
MC(CMC)CTC_Div-IINo10/2026-27
Open Tender
Civil Works - Others
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹48,800
Yes
28 May 2026
28 May 2026
10 Jun 2026
28 May 2026
6 Jun 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in all kind of soil within 50 m Initial lead and 1.5m. Initial lift icluding rough dressing and bracking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m. in depth and as per the direction of the EIC. 14 | 294.03 | Cum | 300.82 | ₹88,450.1 | BI01010001010000000000000515BI0100001121 |
| 2 | Providing spreading, filling in foundation and plinth with sand watered and rammed as per OPWD specification including cost of materials, labour, conveyance, royalty, Tools and Plants etc.all complete required for the work to finished items of work. 18 | 44.1 | Cum | 613 | ₹27,033.3 | BI01010001010000000000000515BI0100001122 |
| 3 | PCC (1:4:8) with 40 mm size HBGS metal including all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 38 | 42.47 | Cum | 6,034 | ₹2,56,263.98 | BI01010001010000000000000515BI0100001123 |
| 4 | RCC work of M20 grade with 20 mm and down grade CBHGC including hosting and laying all cost of materials, labour, conveyance, royalty, T & P, water for curing etc.all complete. 57 | 206.37 | Cum | 6,987.5 | ₹14,42,010.38 | BI01010001010000000000000515BI0100001124 |
| 5 | Requirement of HYSD/ MS rod and labour for cutting, bending, hinding, straighting and laying the grills and placing in position including cost of rod & binding weir 18 to 20 gauge 62 | 150.65 | Qtl. | 9,398 | ₹14,15,808.7 | BI01010001010000000000000515BI0100001125 |
| 6 | Rigid and Smooth centering and shuttering for RCC works including false work and dismentalling then after casting including cost of materials complete in ground floor.64Drain Raft | 32.67 | Sqm | 248.9 | ₹8,131.56 | BI01010001010000000000000515BI0100001126 |
| 7 | Drain Wall | 872.2 | Sqm | 1,077.1 | ₹9,39,446.62 | BI01010001010000000000000515BI0100001127 |
| 8 | Pre- Cast Slab | 413.82 | Sqm | 248.9 | ₹1,02,999.8 | BI01010001010000000000000515BI0100001128 |
| 9 | Transporting the excavated earth by Mechanical means within 5.00 km lead including initial lead and lift, loading & unloading etc all complete. 20 | 264.63 | Cum | 276.01 | ₹73,040.53 | BI01010001010000000000000515BI0100001129 |
| 10 | Shoring and shuttering for the excavated trench up to depth of 1.50 m from G.L including cost of all labour , T & P etc. all complete. 21 | 435.6 | Sqm | 327.5 | ₹1,42,659 | BI01010001010000000000000515BI0100001130 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_592957.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid