Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 52 42 ADITI APARTMENT BLOCK C TASHKAND MARG CIVIL LINES PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.1 L
EMD Value
₹18,160
Closing Date
13 Apr 2026, 12:00 pmClosed
B.D.O. SADAT GHAZIPUR
OFFICE B.D.O. SADAT GHAZIPUR
SALEMPUR BAGHAE ME CHHATH MATA POKHARE PAR SAMUDAYIK SHAUCHALAY KA NIRMAN KARYA
2026_RDUP_1130542_38
951 date 24.03.2026
Open Tender
Civil Works
Percentage
90 days
SADAT GHAZIPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
B.D.O. SADAT GHAZIPUR
₹18,160
13 Apr 2026
26 Mar 2026
13 Apr 2026
26 Mar 2026
13 Apr 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation in foundation in ordinary soil including lift upto 1.50 M and lead upto 30M. Including watering ramming and dressing etc. and disposal of surplus earth as upto a distance of 30 M. from the foundation trenches.etc. required for proper completion of the work. SI.No. 251. | |||||
| 2Concrete with 4 cm gauge brick ballast Coarse sand of 2.25 F.M and cement in proportion of 1:4:8 in foundation and under floor including supply of all materials labour T & P etc. required for proper completion of the work. S.I.No. 275 | |||||
| 3M- 150 brick work in 1:3 cement & C sand in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 305 | |||||
| 4R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 in R.C.C Tie beam SI.No. 283 | |||||
| 5M- 150 brick work in 1:6 cement & C sand in super structure for Half Brick wall including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 303 309 & 310 (For One Brick wall) | |||||
| 6M- 150 brick work in 1:4 cement & C sand in super structure for Half Brick wall including supply of all materials, labour and T&P etc. required for proper completion of the work. S.I.No. 305, 309, 310 & 310a (For Half Brick wall) | |||||
| 7R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:2:4 in Slab. S.I. No. 284 | |||||
| 8Mild steel iron in plain work such as in reinforced concrete or rein force brick work wrought to required shape as necessary cutting. bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured required to proper completion of the work S.I.No. 504 | |||||
| 912 mm thick plaster on roughface of wall with cement mortar consising of 1 part cement and 4 part of approved coarse sand. Minimum thickness not to be less then 10 mm including supply of all materials, labour and T & P etc. required for completion of work. as per S.I.No. 584 - 596 | |||||
| 1012 mm thick plaster on Plain surface of wall with cement mortar consising of 1 part cement and 4 part of approved coarse sand. Minimum thickness not to be less then 10 mm including supply of all materials, labour and T & P etc. required for completion of work. as per S.I.No. 584 | |||||
stage.html
html • 0.02 MB
finance_2109067.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_2109067.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .