ZONAL OFFICER
ZONE-X
Repair and improvements to the damaged portion of the existing storm water drain at 10th Avenue and 11th Avenue, Ashok Nagar in Div-131, Unit-31, Zone-10
2026_CoC_658623_1
Z.O.X.C.No.E1/KKM/178/2026
Limited
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,100
30 Jun 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC Slab (reinforcement is being co...torm Water Drain - Steel is declared unfit for use | 12.3 | CUM | 2,220.9 | ₹27,317.07 |
| 2 | Dismantling the existing brick or stone masonry wo...uding carefully clearing the debris etc. complete. | 14 | CUM | 311.45 | ₹4,360.3 |
| 3 | Desilting of Storm Water Drain | 18 | CUM | 162.71 | ₹2,928.78 |
| 4 | Earth work excavation for foundation in all kinds ...lling the sides with excavated earth etc. complete | 18 | CUM | 135.59 | ₹2,440.62 |
| 5 | Carting away the surplus earth/debris to a lead of... the Corporation Land as directed during execution | 58 | CUM | 226.56 | ₹13,140.48 |
| 6 | Brick work with fly ash bricks of size 230mm x110m...ick walls upto basement .(upto 1m high above G.L.) | 7 | CUM | 7,608 | ₹53,256 |
| 7 | Plastering with cement mortar 1:4 (1 cement and 4 ... sand)12mm thick including curing, etc., complete. | 36 | SQM | 301.41 | ₹10,850.76 |
| 8 | Plain Cement concrete work 1:4:8 (1 cement, 4 Crus..., etc. complete for foundation, etc. upto basement | 2.4 | CUM | 5,832 | ₹13,996.8 |
| 9 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 1,386 | KGS | 94 | ₹1,30,284 |
| 10 | Supplying and erecting centering for sides and sof...m dia spaced at 75cm centre to centreetc. Complete | 104 | SQM | 1,040.23 | ₹1,08,183.92 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_790143.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .