| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | ₹54.1 L Quoted ₹55.9 L | L1 | Accepted-AOC ACCEPTED BEING LOWEST BIDDER |
| 2 | L2₹59.9 L+₹4.0 L (7.22%)Rejected-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | ₹59.9 L+₹4.0 L (7.22%) | L2 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 3 | L3₹69.1 L+₹13.2 L (23.6%)Rejected-Finance AADARSH RESIDENCY LANE 06 PAWAR COLONY NEAR PMC SCHOOL VITTHAL NAGAR S NO 15 HADAPSAR PUNE | ₹69.1 L+₹13.2 L (23.6%) | L3 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 4 | L4₹82.9 L+₹27.0 L (48.4%)Rejected-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹82.9 L+₹27.0 L (48.4%) | L4 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 5 | L5₹98.6 L+₹42.8 L (76.6%)Rejected-Finance | ₹98.6 L+₹42.8 L (76.6%) | L5 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | MOHANLAL MATHRANI CONS. PVT. LTD. L5 | Aadarsh Bharat Enviro Pvt Ltd L3 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L2 | VP DEVELOPERS AND CONTRACTOR L4 | Ganesh Enterprises L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Scarifying or picking up gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth exc 50 mm and n.exc 100 mm complete all as specified and directed by Engr-in-charge. | 66 | Per 10 Sqm | 369 ₹24,354 | 20 ₹1,320 | 18 ₹1,188 Lowest | 82 ₹5,412 | 20 ₹1,320 |
| 2.00 | Screening road metal, Chippings, etc. on the site of the work, when specially ordered, including removing screened materials clear of screen and stacking in separate heaps for measuring (Materials from both sides of screen measured) complete all as specified and directed by Engr-in-charge. | 7.5 | Cum | 230 ₹1,725 | 55 ₹412.5 | 40 ₹300 Lowest | 210 ₹1,575 | 100 ₹750 |
| 3.00 | Laying only (Except material) and compacting 75mm thk (compacted thickness) WBM with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), ((obtained from item above screening road metal) spread rolled and consolidated to gradient materials and camber required (type of aggregate granite, trap or basalt), except material complete all as specified and directed by Engr-in-charge. | 10 | Per 10 Sqm | 405 ₹4,050 | 300 ₹3,000 | 250 ₹2,500 Lowest | 1,200 ₹12,000 | 1,200 ₹12,000 |
| 4.00 | Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber The finished surface tolerances to be as per Table 900-1 of MORTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-charge. | 56 | Per 10 Sqm | 1,440 ₹80,640 | 1,250 ₹70,000 Lowest | 1,250 ₹70,000 Lowest | 2,750 ₹1,54,000 | 1,400 ₹78,400 |
| 5.00 | M &L Preparing unsurfaced WBM/WMM/bituminous macadam surface by brushing with wire brush for removing caked mud etc., sweeping with brooms, and finally fanning the cleaned surfaces with gunny bag to remove all loose dirt etc and for applying evenly a tack coat with bituminous primer VG-10 @ 7.5 kg per 10 Sqm with sprayer over existing surface etc complete all as specified and directed by Engr-in-charge. | 66 | Per 10 Sqm | 810 ₹53,460 | 375 ₹24,750 | 500 ₹33,000 | 1,800 ₹1,18,800 | 200 ₹13,200 Lowest |
| 6.00 | M & L Premix bituminous macadam bitumen (VG-30) with 4% binder content using paving bitumen) by weight of total mix laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) complete all as specified and directed by Engr-in-charge. | 170 | Cum | 10,980 ₹18,66,600 | 6,000 ₹10,20,000 | 5,000 ₹8,50,000 Lowest | 9,500 ₹16,15,000 | 5,500 ₹9,35,000 |
| 7.00 | M & L for applying evenly a tack coat with bituminous primer( paving bitumion) VG-10 @ 2. 5 kg per 10 Sqm with sprayer over bituminous macadam/existing black top etc complete all as specified and directed by Engr-in-charge. | 1,662.19 | Per 10 Sqm | 270 ₹4,48,791.3 | 125 ₹2,07,773.75 Lowest | 200 ₹3,32,438 | 299 ₹4,96,994.81 | 160 ₹2,65,950.4 |
| 8.00 | Preparation of existing black top surfaces by brushing with wire brushes and removing caked mud etc sweeping with broom and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed by Engr-in-charge. | 1,322.19 | Per 10 Sqm | 60 ₹79,331.4 | 40 ₹52,887.6 | 5 ₹6,610.95 Lowest | 400 ₹5,28,876 | 100 ₹1,32,219 |
| 9.00 | M & L for bituminious premix asphaltic semi dense concrete 40mm thick consolidated thickness with 5.5% binder content( paving bitumen VG- 30) by weight of total mix all as per job mix formula, duly rolled and compacted to required camber and gradient with 8-12 tonne power roller and vibrating roller etc complete all as specified and directed by Engr-in-charge.
Note : The contractors quoted rates shall be deemed to include the following elements (i) The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work. (ii) In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in quanity of bitumen shall be adjusted with price adjustment. | 66 | Per 10 Sqm | 5,004 ₹3,30,264 | 3,250 ₹2,14,500 | 3,200 ₹2,11,200 | 3,500 ₹2,31,000 | 2,700 ₹1,78,200 Lowest |
| 10.00 | M & L for bituminious premix asphaltic semi dense concrete 30mm thick consolidated thickness with 5.5% binder content( paving bitumen VG- 30) by weight of total mix all as per job mix formula, duly rolled and compacted to required camber and gradient with 8-12 tonne power roller and vibrating roller etc complete all as specified and directed by Engr-in-charge.
Note : The contractors quoted rates shall be deemed to include the following elements (i) The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work. (ii) In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in quanity of bitumen shall be adjusted with price adjustment. | 1,322.19 | Per 10 Sqm | 3,888 ₹51,40,674.72 | 3,100 ₹40,98,789 | 2,650 ₹35,03,803.5 | 2,800 ₹37,02,132 | 2,180 ₹28,82,374.2 Lowest |
Tender Value
₹84.0 L
EMD Value
₹1.5 L
Closing Date
6 Jul 2026, 6:00 pmClosed
CWE Khadki Pune
Headquarters CWE Khadki, Military Engineer Services, Range Hills Road, Khadki, Pune-411003
SPECIAL REPAIR TO ROAD NEAR SEMT WG AND PHALKE CIRCLE AND BEHIND MI ROOM AND MAGAZINE GUARD AT CME PUNE UNDER GE CME KHADKI
2026_MES_770016_1
CWE/KKE/TOKEN-06 OF 2026-27
Open Tender
Civil Works - Roads
Item Rate
180 days
CWE Khadki Pune
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹1,000
Yes
GE CME KHADKI
₹1.5 L
Yes
11 Sept 2026
5 Jun 2026
9 Jul 2026
5 Jun 2026
6 Jul 2026
27 Jun 2026
5 Jun 2026 - 20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying or picking up gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth exc 50 mm and n.exc 100 mm complete all as specified and directed by Engr-in-charge. | 66 | Per 10 Sqm | 47.9 | ₹3,161.4 |
| 2 | Screening road metal, Chippings, etc. on the site of the work, when specially ordered, including removing screened materials clear of screen and stacking in separate heaps for measuring (Materials from both sides of screen measured) complete all as specified and directed by Engr-in-charge. | 7.5 | Cum | 229.5 | ₹1,721.25 |
| 3 | Laying only (Except material) and compacting 75mm thk (compacted thickness) WBM with coarse aggregates of grading 2 (63 to 40mm size) or of grading 3 (50 to 20mm size), ((obtained from item above screening road metal) spread rolled and consolidated to gradient materials and camber required (type of aggregate granite, trap or basalt), except material complete all as specified and directed by Engr-in-charge. | 10 | Per 10 Sqm | 484.9 | ₹4,849 |
| 4 | Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MORTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-100 KN static weight and consolidating to required gradien and camber The finished surface tolerances to be as per Table 900-1 of MORTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-charge. | 56 | Per 10 Sqm | 2,101.35 | ₹1,17,675.6 |
| 5 | M &L Preparing unsurfaced WBM/WMM/bituminous macadam surface by brushing with wire brush for removing caked mud etc., sweeping with brooms, and finally fanning the cleaned surfaces with gunny bag to remove all loose dirt etc and for applying evenly a tack coat with bituminous primer VG-10 @ 7.5 kg per 10 Sqm with sprayer over existing surface etc complete all as specified and directed by Engr-in-charge. | 66 | Per 10 Sqm | 748.35 | ₹49,391.1 |
| 6 | M & L Premix bituminous macadam bitumen (VG-30) with 4% binder content using paving bitumen) by weight of total mix laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) complete all as specified and directed by Engr-in-charge. | 170 | Cum | 8,915.7 | ₹15,15,669 |
| 7 | M & L for applying evenly a tack coat with bituminous primer( paving bitumion) VG-10 @ 2. 5 kg per 10 Sqm with sprayer over bituminous macadam/existing black top etc complete all as specified and directed by Engr-in-charge. | 1,662.19 | Per 10 Sqm | - | - |
| 8 | Preparation of existing black top surfaces by brushing with wire brushes and removing caked mud etc sweeping with broom and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. complete all as specified and directed by Engr-in-charge. | 1,322.19 | Per 10 Sqm | 216.4 | ₹2,86,121.92 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_862299.xls
BOQ • 3.42 MB
Tender.pdf
Tender Documents • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .