Loading…
Loading…
Tender Value
₹8.5 L
EMD Value
₹16,940
Closing Date
27 Aug 2026, 2:00 pmDue tomorrow
Executive Engineer REW Leh
REW Leh
Construction of Culvert at Giani Gonpa Road Hunderi 3 Nos.
2026_RDD_19380_1
34- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Payable To Executive Engineer REW Leh
₹16,940
18 Aug 2026
18 Aug 2026
29 Aug 2026
18 Aug 2026
27 Aug 2026
18 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 152.82 | cum | 208.42 | ₹31,850.74 |
| 2 | Providing laying of dry stone soling (any thickness) on horizontal level including cost of stone. | 14.15 | cum | 953.02 | ₹13,485.23 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) : | 54.37 | cum | 6,606.08 | ₹3,59,172.57 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 11.89 | cum | 11,102.31 | ₹1,32,006.47 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,188.6 | KG | 109.33 | ₹1,29,949.64 |
| 6 | Centring and shuttermg including strutting, propping etc. Foundations, footings, bases of columns etc. for mass concrete | 148.64 | Sqm | 306.15 | ₹45,506.14 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms. | 29.73 | Sqm | 738.64 | ₹21,959.77 |
| 8 | Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and
dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m :Deduct for not rolling with power roller of minimum 8 tonnes for banking
excavated earth in layers not exceeding 20 cm in depth. Deduct for not watering the excavated earth for banking | 117.16 | cum | 355.31 | ₹41,628.12 |
| 9 | Carriage of Sand and Stone aggregate by an avg lead of 10 kms by MT | 89.16 | cum | 251.71 | ₹22,442.46 |
| 10 | Carriage of Cement and steel by an average lead of 200 kms by MT | 16.72 | MT | 1,623.72 | ₹27,148.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_46007.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].