Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
14 Mar 2023, 2:00 pmClosed
SE/MEDC/Mettur
O/o SE/MEDC/Mettur
works for effecting services in various schemes in Rural and South Kolathur section in Mettur division
2023_EB_293829_1
EE/MTR/WC spec No.M.011/22-23
Open Tender
Electrical Works
Works
365 days
SE/MEDC/Mettur dam
EMD and documents as per BQR conditions
2 documents required · 2 mandatory
₹0
₹5,000
27 Mar 2023
8 Mar 2023
15 Mar 2023
8 Mar 2023
14 Mar 2023
8 Mar 2023
8 Mar 2023 - 14 Mar 2023
Amount
Work contract schedule
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB
Excavation of pole pit for 30' RCC Pole/9.00m PSC Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC poles upto 8.00m. (27' ) by using Crane or manual
Erection of PSC/RCC poles upto 9.14m.( 30' ) by using Crane or maual
Erection of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
ii) Fixing of HT pin Insulators 11 KV
Fixing of HT 11 KV strain disc.
i) Fixing of LT pin Insulator
ii) Fixing of LT shackle
iii) Fixing of Aluminium Knob
Paving and Stringing of 7/4.09 mm ACSR
Paving and Stringing of 7/3.35 mm ACSR 7/3.0 mm AAAC
Paving and stringing of 7/2.59 mm/ ACSR 7/2.11 mm ACSR
ERECTION of HVDS COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2' x 2' x 6') for both base and sleeve including supply of jelly, sand and cement by the contractor in the ratio of concreting 1:3:6 , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought
Erection of DT structure with AB Switch, Top channal cross bracing Earthing painting providing stay include concreating
ERECTION of Double Pole TRANSFORMER STRUCTURE COMPLETE inclusive of following works - Excavation of pole pits sizing 2' X 2' X 6', erection of poles, erection of base plate, erection of structure materials , erection of AB switch and HG Fuse, Structure Earthing complete , Pole concreting (2'x2'6') for both base and sleeve including supply of jelly, sand and cement by the contractor , plinth erection with plastering ratio 1:2 including supply of cement and sand , Fixing of Open Type fuse units, HT/LT LAS fixing and LAS earthing through PVC Pipe 0.5" , Provision of bus-bar arrangement, Erection of Stay Set complete, Jumpering, erection of support angles and insulators if any , Alteration of materials in lathe works if any, provision of danger board, 3 Nos Earth pits including erection of cement collar , painting of metal parts, including loading, unloading, transportation of all required materials from stores to site , Road site to pit spot as per the directions by the TANGEDCO Site Engineer (This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars, siling, DShackle etc., that must be brought
Transport of Materials. Below 8 Kms.
Loading & Unloading of line materials
Loading of pole 9.14m & 9.00 Mtr (RCC&PSC Poles)
Unloading of pole 9.14m & 9.00 Mtr (RCC&PSC Poles)
Loading of pole 7.5/8.0m (RCC &PSC Poles)
Unloading of pole 7.5/8.0m (RCC &PSC Poles)
Loading &unloading of transformer upto 100KVA
Loading & Unloading of Transformer above 200KVA
Erection of New Transformer all capacity
Transportation of Poles from road side to pole Pit including Loading and unloading of pole by using JCB or Manual upto 100mtr
Transportation of Poles from road side to pole Pit including Loading and unloading of pole by using JCB or Manual beyand 100mtr
Dismandling of RCC/PSG pole 8.0mtr/7.5mtr
Dismandling of 'V' X arm,channel X arm,guarding X arm(all types)
Dismandling of LT 3 phase X arm
Dismandling of LT single phase X arm
Dismandling of HT/LT TI fitting
Dismandling of 11KV strain disc
Dismandling of 11K pin insulator
Dismandling of LT shackle
Dismandling of LT pin insulator
Dismandling of Aluminium knob
Dismandling of ACSR 7/3.35mm conductor
Dismandling of ACSR 7/2.59mm/ 7/2.11mm conductor
Clearing of Branch of trees
Labour charges for Alternation of clamp
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .