| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.8 L+₹7,926 (0.82%)Rejected-AOC | ₹9.8 L+₹7,926 (0.82%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.8 L+₹14,366 (1.48%)Rejected-AOC 0 INDRAPUR BARGAON GONDA GONDA UTTAR PRADESH 271002 | GONDA | UTTAR PRADESH | 271002 | ₹9.8 L+₹14,366 (1.48%) | L3 | Rejected-AOC L3 |
Tender Value
₹9.9 L
EMD Value
₹99,078
Closing Date
28 May 2026, 3:00 pmClosed
chief Engineer nagar nigam saharanpur
chief Engineer nagar nigam saharanpur
Construction of open jym, land scaping, footpath wall painting suncity park for malhipur road at ward no. 02
2026_NNSAH_1150289_1
6199 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
₹99,078
16 Jul 2026
20 May 2026
29 May 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Concrete with 4 cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. T&P etc. required for proper completion the work | 12 | cum | 2,985 | ₹35,820 |
| 2 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including supply of all material labour, T &P etc. required for proper completion of the work. | 6.12 | cum | 4,520 | ₹27,662.4 |
| 3 | 12 mm thick plaster with cement and approved c sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. | 15.4 | sqm | 160 | ₹2,464 |
| 4 | Cemant concrete with 4cm Gauge stone Ballast Fine sand of 1.25 FM and cemant in Proportion of 4:2:1 in Founfation including supply of all matrial labour and tools and plant for proper complition of work (S.I.No. 279) | 15.6 | m3 | 5,750 | ₹89,682.75 |
| 5 | Cheuered precast cement concrete tiles 22mm thick in footpath & courtyrd, jointed in all complete work | 156 | sqm | 806.83 | ₹1,25,865.48 |
| 6 | Painting or varnishing work in small area or new with Two coat of approved suprior quality | 33.36 | sqm | 89 | ₹2,969.04 |
| 7 | Providing of wall putty with all material labour T&P etc all complete | 461.4 | sqm | 54 | ₹24,915.6 |
| 8 | Finishing wall with water proof cement paint of approved quality on previously new work with two coat tio give in even shade including supply of all materials ,labour and tools and plants etc.. Required for proper completion of work. | 461.4 | sqm | 83 | ₹38,296.2 |
| 9 | Earthwork in cutting or in embankment in ordinary soil in all complete as per S.I. No. 251-a | 30 | cum | 255 | ₹7,650 |
| 10 | Providing wall painting with App quality in all complete work | 2,259.6 | sf | 25.2 | ₹56,941.92 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.73 MB
BOQ_2153718.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .