| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC VADIVELAYYANAYAM | ₹10.4 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹10.4 LRejected-AOC | ₹10.4 L | L2 | Rejected-AOC Highest Amount Quoted |
| Rank | Bidder | Total Amount |
|---|---|---|
| L2 | M/s Sri Kumaran Borewells Bid ID 1596433 | ₹10,43,305.95 |
| L1 | Murugesan Bid ID 1596370 | ₹10,40,117.59 |
| Sl No | Description | Qty | Unit | M/s Sri Kumaran Borewells L2 | Murugesan L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound Wall to the Community Hall Building at Sadivayalpathy H/o Madvarayapuram Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 67.64 | M3 | 265 ₹17,924.6 | 263 ₹17,789.32 |
| 3.00 | Cement concrete 1:4:8 (One of cement, Four of sand and Eight of-hard broken stone) using 3 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. | 7.17 | M3 | 5,732 ₹41,098.44 | 5,731 ₹41,091.27 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 4 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 146.32 | M3 | 548 ₹80,183.36 | 547 ₹80,037.04 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and
conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum | 19.92 | M3 | 9,475 ₹1,88,742 | 9,474 ₹1,88,722.08 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.7 | MT | 91,939 ₹1,56,296.3 | 91,938 ₹1,56,294.6 |
| 8.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for 7 foundation and basement including curing etc., complete complying with standard specification. | 28.84 | M3 | 7,370 ₹2,12,550.8 | 7,369 ₹2,12,521.96 |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors 8 including curing etc. complete complying with standard specification and as directed by the departmental officers. | 337.59 | M3 | 290 ₹97,901.1 | 286 ₹96,550.74 |
| 10.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., | 337.59 | M3 | 265 ₹89,461.35 | 262 ₹88,448.58 |
| 11.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,59,148 ₹1,59,148 | 1,58,662 ₹1,58,662 |
Tender Value
₹10.7 L
EMD Value
₹10,710
Closing Date
13 Feb 2026, 3:55 pmClosed
Special Officer, Madvarayapuram
Panchayat Office, Madvarayapuram Panchayat
Construction of Compound Wall to the Community Hall Building at Sadivayalpathy H/o Madvarayapuram Panchayat
2026_RDTN_654485_1
1/2025/FRA Compound Wall MP
Open Tender
Civil Works
Sadivayalpathy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,710
Yes
Panchayat Office, Madvarayapuram Panchayat
18 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
13 Feb 2026
10 Feb 2026
12 Feb 2026
Construction of Compound Wall to the Community Hall Building at Sadivayalpathy H/o Madvarayapuram Panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 (One of cement, Four of sand and Eight of-hard broken stone) using 3 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers..
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 4 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for 7 foundation and basement including curing etc., complete complying with standard specification.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors 8 including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_784769.xls
BOQ • 0.26 MB
TBWALLMP.pdf
Tender Documents • 0.38 MB
PBWALLMP.pdf
Tender Documents • 0.34 MB