Executive Engineer, C.P. Division No.4, Chandigarh
Executive Engineer, C.P. Division No.4, Chandigarh
Construction of New Govt. Building in Govt. Model Senior Secondary School, Village Maloya, Chandigarh (Composite Work)
2026_CHD_92960_1
CP4/2026/185513
Open Tender
Composite Works
540 days
Construction of New Govt. Building in Govt. Model
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18.3 L
3 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Work Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (As per DSR 2.6.1) | 850.34 | /cum | 172.71 | ₹1,46,862.22 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (As per DSR 2.8.1) | 133.05 | /cum | 253.27 | ₹33,697.57 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sidesof foundations etc. in layers not exceeding 20cm in depth, consolidatingeach deposited layer by ramming and watering, lead up to 50 and for all lift. (As per DSR 2.25) | 25.33 | /cum | 190.71 | ₹4,830.68 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (As per DSR 2.27) | 86.76 | /cum | 2,066.41 | ₹1,79,281.73 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mmnominal size derived from natural sources) (As per DSR 4.1.8) | 93.48 | /cum | 6,628.08 | ₹6,19,592.92 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) (As per DSR 4.1.10) | 237.06 | /cum | 6,342.6 | ₹15,03,576.76 |
| 7 | Providing & applying a coat of residual petrolium bitumen of grade of VG-10 of approved quality using 1.70kg per square meter on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil (As per DSR 4.13) | 137.85 | /sqm | 142.2 | ₹19,602.27 |
| 8 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including (As per DSR 4.17) | 117.45 | /sqm | 729.07 | ₹85,629.27 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (As per DSR 5.3) | 1.73 | /cum | 11,194.85 | ₹19,367.09 |
| 10 | Reinforced cement concrete work in vertical and horizontal fins individually or forming box louvers, facias and eaves boards above plinth level up tofloor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (As per DSR 5.8) | 14.25 | /cum | 11,145.08 | ₹1,58,817.39 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 25.06 MB
BOQ_113785.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid