Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.3 LAccepted-AOC NO 143 B7 PART BOMMASANDRA BANGALORE KARNATAKA 560099 | BENGALURU URBAN | KARNATAKA | 560099 | L1 | Accepted-AOC L1 | |
| 2 | L2₹33.1 L+₹4.7 L (16.7%)Rejected-AOC 25 A BR SAMY LANE KATTOOR COIMBATORE 641009 | COIMBATORE | COIMBATORE | TAMIL NADU | 641009 | L2 | Rejected-AOC Other than L1 |
Tender Value
₹26.5 L
EMD Value
₹53,000
Closing Date
24 Jan 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE DSSC
GE DSSC WELLINGTON BARRACKS-POST, WELLINGTON, THE NILGIRIS, TAMIL NADU,PIN-643231
PROVN OF CERTAIN E/M SERVICES AT BLDG NO P-58 AND P-92 INCL CONNECTED WORKS AT DSSC WELLINGTON
2021_MES_489637_2
8211/E8
Open Tender
Civil Works
Item Rate
120 days
WELLINGTON
PLEASE REFER TENDER DOCUMENTS AND NIT
8 documents required · 8 mandatory
₹500
GE DSSC WELLINGTON
₹53,000
Yes
18 Feb 2022
31 Dec 2021
26 Jan 2022
31 Dec 2021
24 Jan 2022
7 Jan 2022
60 days
Amount
Supply, install, commissioning and testing of 120 litres Seamless CCOE Cylinder with valve and contacted Pressure Gauge complete all as specified and as directed. Make : RAMA / EKC/WORTHINGTON
Supply, install, commissioning and testing of 140 litres Seamless CCOE Cylinder with valve and contacted Pressure Gauge complete all as specified and as directed. Make : RAMA / EKC/WORTHINGTON
Note for Item Nos 1 & 2 : (i) The cylinder shall be PESO approved high pressure, seamless steel gas cylinder, flat type, concave bottom as per IS 7285 complete with neck ring. Welded and Non-PESO approved cylinders will not be accepted. Test certificates for cylinders and connected accessories shall be submitted. (ii) Cylinder shall be mounted according to manufacturer recommendations. The cylinder shall withstand Hydrostatic test pressure of minimum 250 bar. (iii) The cylinders should be complete with all accessories. The contractor shall indicate the dimensions of the cylinders required for each area while quoting.
Supply, filling and testing of Novec 1230 Gas complete all as specified and as directed. Make : 3M or techno-commercially equivalent as approved by GE.
Note : (i) Novec-1230 systems shall be designed with minimum design concentration of 4.5% (0.653 kg/m³) as applicable to class 'A & C' risks according to NFPA-2001 (2018 edition). (ii) The clean agent Novec 1230 should be procured only from the Manufacturer 3M or their authorized OEM’s . A certification (from the manufacturer of the agent or their direct distributor) on the genuinity and quality of the agent filled in the system procured should be submitted by the System Engineering Company. (iii) Supply, filling and testing of Novec 1230 Gas in 01 No Gas Cylinder already available at site has to carried out to incorporate the same and made part of the new Gas Based Fire Suppression System complete all as specified & as directed & cost of the same deemed to be included in the unit quoted rates.
Supply, install, commissioning and testing of Electromagnetic Actuator complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Commissioning and testing of Electromagnetic Actuator. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE. Note : Commissioning & testing of the Electromagnetic Actuator already available at site in existing or new position/location has to carried out to incorporate the same & made part of the new Gas Based Fire Suppression System
Supply, install, commissioning and testing of Pneumatic Actuator complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Discharge Hose complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Actuation Hose complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Manual Pneumatic Actuator complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Commissioning and testing of Manual Pneumatic Actuator complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE. Note : Commissioning and testing of the Manual Pneumatic Actuator already available at site in existing or new position/location has to carried out to incorporate the same and made part of the new Gas Based Fire Suppression System
Supply, install, commissioning and testing of Discharge Nozzle complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Discharge Pressure Switch complete all as specified and as directed. Make : Sinorix /LPG/Rotarex or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Cylinder Stand complete all as specified and as directed. Make : TOPAZ or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of ASTM A-106 Grade-B seamless pipes SCH 40, fabricated cylinder supports and stand and special threaded fittings with necessary angle / Hitech supports with anchor fasteners including painting of two coats of primer with one coat of signal red paint & Nitrogen pressure testing of installed piping complete all as specified and as directed. Make : JINDAL/TATA/ELECTROSTEEL
Supply, install, commissioning and testing of ASTM A-106 Grade-B seamless pipes SCH40 Manifold with necessary fittings/fixtures/anchor fasteners etc. including painting of two coats of primer with one coat of signal red paint and Nitrogen pressure testing of installed piping complete all as specified and as directed. Make : JINDAL/TATA/ELECTROSTEEL
Note for Item Nos 14 & 15 : (i) All Pipes shall be of ASTM-A-106, Gr: B, schedule-40 seamless CS Pipes and fittings shall be as per ASTM A-105, A 234 standard of appropriate class. (ii) All Fitting Joints below 2” size shall be threaded or Socket Welded. All Fitting Joints above 2” size shall only be Butt / Socket Welded. The Contractor shall provide the Test Certificates for all Pipes and Fittings. (iii) The pipe network shall be pressure tested as per NFPA.
Supply, install, commissioning and testing of 2 Zone Gas Release Panel complete all as specified and as directed. Make : Simplex /Ravel /Secutron or techno-commercially equivalent as approved by GE.
Commissioning and testing of 2 Zone Gas Release Panel complete all as specified and as directed.
Note : 1) Commissioning and testing of the 2 Zone Gas Release Panel already available at site in existing or new position/location has to carried out to incorporate the same and made part of the new Gas Based Fire Suppression System.
Supply, install, commissioning and testing of Multisensor Detectors complete all as specified and as directed. Make : Simplex /Ravel/ Secutron or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Manual Release Switch complete all as specified and as directed. Make : Simplex/Ravel/Secutron or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Manual Abort Switch complete all as specified and as directed. Make : Simplex/Ravel/Secutron or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Hooter Cum Strobe complete all as specified and as directed. Make : Simplex/Ravel/Secutron or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Warning Signage Inside Room complete all as specified and as directed. Make : TOPAZ or techno-commercially equivalent as approved by GE.
Supply, install, commissioning and testing of Warning Signage Outside Room complete all as specified and as directed. Make : TOPAZ or techno-commercially equivalent as approved by GE.
Supply and laying of 2C x 1.5 Sq.mm FRLS Cable complete all as specified and as directed. Make : POLYCAB/HAVELLS/FINOLEX
Supply, installing, testing and commissioning of PVC conduits on ceiling / wall / floor etc. complete with accessories like Junction boxes, collars, bends etc. of size 25 mm dia complete all as specified and as directed. Make : RAMA / EKC/ FINOLEX /PRECISION /BERLIA
Supply, install, commissioning and testing of VESDA Panel complete all as specified and as directed. Make : Model No VLF-250 of make XTRALIS or techno commercially equivalent of SECUTRON/SIEMENS
Supply, install, commissioning and testing of Power Supply for VESDA unit complete all as specified and as directed. Make : Model No VPS-220-E of make XTRALIS or techno commercially equivalent of SECUTRON/SIEMENS
M & L for Conduct of Room Integrity Test after installation & commissioning of the complete Gas-Based Fire Detection, Alarm and Suppression System complete all as specified and as directed.
NOTE : As per NFPA 2001 the design concentration of a clean agent post discharge shall be maintained for a sufficient period of time to ensure there is no reignition of fire once suppressed. NFPA 2001 also requires an enclosure integrity test as part of the acceptance procedure for all clean agent systems. This includes halocarbon and inert agents. This comprehensive test and calculation predict the leakage area corresponding to the retention time of agent in the enclosure on discharge. Subject tests to be carried out by OEM/Auth Agent etc. in the presence of rep of AO & necessary test certificates submitted.
IMP NOTES FOR ITEM NOS 1 TO 28 : (i) Design / drawing / BOM / technical specifications of the complete Gas based Fire Suppression System showing the layout & other details etc. is to be obtained from OEM / Auth Channel Partner / Supplier & is to be got approved from Engr-in-charge & GE before placing final order. Techno-Commercial Comparative Analysis is also required to be submitted to Engr-In-Charge & GE whereever equivalency w.r.t. a given Make/Model/Cat-Part Ref is concerned. (ii) The complete installation, commissioning & testing of the Gas based Fire Suppression System is to be got done from the OEM or their auth Rep/Sister Concern/Channel Partners only & reports submitted to GE in duplicate. (iii) The cost of periodical/routine servicing/maintenance including minor repairs/replacement of spare parts (if required) including periodical checking of the complete Gas based Fire Suppression System for the complete defect liability period (2 Years from certified date of completion of work) from the authorized service dealer/rep as & when required/due is deemed to be included in the unit quoted rates. (iv) Any item/work etc. missed out in the technical specifications but technically required for efficient working of the Gas based Fire Suppression System is deemed to be included in the quoted rates. (v) Detailed Technical Specifications w.r.t. the Items/Eqpts/System of the Gas based Fire Suppression System has been highlighted in the Particular Specifications of the Tender/Contract same to be adhered to by the Contr/Firm. Contr/Firm is therefore required to visit the site of work for any doubts/clarifications w.r.t. specifications/qty etc. before quoting of the Tender. Any query/clarifications etc. after conclusion of the Contract shall NOT be entertained & decision of the AO shall be final & binding. (vi) Subject work to be carried out by the OEM or an authorized, trained and certified reseller of a manufacturer/distributor of Novec-1230 system. Documentation to validate the same shall be submitted along with the bid documents. A copy of certificate of authenticity, for the agent from the manufacturer/distributor is also to be submitted to the Engr-In-Charge. (vii) The Contr/Firm should prepare & submit along with the bid documents, the piping Isometric drawing and support the same with a hydraulic flow calculation generated by design software. The calculations shall validate the fill density assumed by the bidder. (viii) The Contr/Firm shall also submit copies of the datasheets of the hardware used in the system. The bidder shall also submit copy of PESO approval letter for the cylinder proposed to be used. These documents shall be attached to the bid. (ix) The Contr/Firm shall also submit calculations to justify the qty of agent considered for the system. (x) The Contr/Firm should provide, as part of handing over, the as-built drawing, operation manual and maintenance manual. The as-built drawing shall exactly match the Isometric drawing submitted with the flow calculation prior to commencement of work. (xi) Existing FM 200 Gas cylinder kept at ITRC location has to be taken to a PESO approved filing station and refilled with Novec-1230 gas. Cost of transportation to and from is deemed to be included in the unit quoted rates. Novec 1230 Gas shall be measured and paid as supply, filling and testing only against relevant items of BOQ.
rvelectricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .