Loading…
Loading…
Tender Value
Refer Docs
Closing Date
2 Apr 2026, 5:30 amClosed
NHIT Eastern Projects Private Limited
Unit 325, 3rd Floor, D21 Corporate Park, Sector 21, Dwarka, Dhulsiras, New Delhi-110077
Request for Proposal (“RFP”) issued by NHIT Eastern Projects Private Limited (NEPPL) for Engagement of Agency/Firm for repair work of Bridge approach roads on four-lane of Kochugaon-Kalijhar (WB / Assam Border – Bijni – Manikpur) Road Section of NH-27 in the state of Assam.
NEPPL/FY25-26/RFP/Assam/Bridge Approach Road Repair work
NEPPL/FY25-26/RFP/Assam/Bridge Approach Road Repair work
RFP
Assam
29 Jan 2026
29 Jan 2026
2 Apr 2026
Dismantling and removing PQC and approach slab (up to 100 mm thickness): Careful dismantling of existing PQC/approach slab up to 100 mm thickness by approved mechanical/manual means, ensuring no damage to the underlying panels or structural components. The dismantled concrete shall be collected, loaded, transported, and disposed of/scrapped at an approved location up to 10 km lead from the site, including all labour, tools, plants, safety & environment measures, and complete as per the direction of the Engineer-in-Charge.
Providing and laying M40 grade concrete Providing, transporting, and placing M40 grade cement concrete from an approved RMC plant, including supply of all materials, labour, equipment, and shifting to site. Laying, compacting, finishing, and maintaining proper levels, lines, and slopes of the CC wearing coat, including texturing, groove cutting (extra), curing, and all incidental works required to complete the item as per specifications and as directed by the Engineer-in-Charge.
Providing, cutting, bending, binding, and placing of 10 mm diameter TMT FE 500 bars at 150 mm center-to-center spacing both ways for wearing coat raft reinforcement, including cost of binding wire, supports, chairs, laps, wastage, and all handling, transportation, and incidental works—complete in all respects as per drawing, relevant IS codes, and instructions of the Engineer-in-Charge. Reinforcement bars from the approved make shall only be used. Safety measures and quality checks shall be implemented during all stages, ensuring high-standard reinforcement for structural integrity.
Removal of existing wearing coat over the approach slab: Careful dismantling and removal of the existing wearing coat over the approach slab using approved manual/mechanical methods, including cleaning, collection, loading, transportation, and disposal of dismantled material to an approved dumping location. The work shall include all labour, tools, equipment, safety & environment measures and complete as per the direction of the Engineer-in-Charge.
Chainage
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Approach slab top level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Length
Difference in level
Difference in level
Difference in level
Difference in level
Length
Difference in level
Difference in level
Cover
Item Description
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
metadata.json
RAW_JSON
RFP - Bridge Approach road repair Assam NEPPL 280126_R.pdf
TENDER_DOCUMENT • 5.19 MB
Annexure C3 BoQ - Bridge Approach+Slab_CC+Wearing+Coat Assam-20260123_R.xlsx
BOQ_DOCUMENT • 0.10 MB
Corrigendum I - NEPPL RFP Assam Bridge Approach Repair road 11022026A.pdf
CORRIGENDUM_DOCUMENT • 0.22 MB
Corrigendum II - NEPPL RFP Assam Bridge Approach Repair road 18022026A.pdf
CORRIGENDUM_DOCUMENT • 0.21 MB
Corrigendum III - Approach Road Repair - Assam NEPPL.pdf
CORRIGENDUM_DOCUMENT • 0.47 MB
Corrigendum IV - RFP Approach Road repair - Assam NEPPL.pdf
CORRIGENDUM_DOCUMENT • 0.16 MB
Corrigendum V - NEPPL RFP Assam Bridge Approach Repair road 20032026A.pdf
CORRIGENDUM_DOCUMENT • 0.16 MB
Corrigendum VI - NEPPL RFP Assam Bridge Approach Repair road 26032026A.pdf
CORRIGENDUM_DOCUMENT • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .