Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.5 LAccepted-Finance 110 MINI SHOPPING COMPLEX NEHRU MARKET JAMMU | 1 | Accepted-Finance FOUND ELIGIBLE | |
| 2 | 2₹9.6 L+₹3,000 (0.32%)Accepted-Finance MAIN CHOWK TABAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | 2 | Accepted-Finance FOUND ELIGIBLE | |
| 3 | 3₹13.8 L+₹4.3 L (44.8%)Accepted-Finance JAMMU AND KASHMIR JAMMU AND KASHMIR | JAMMU | JAMMU AND KASHMIR | 181122 | 3 | Accepted-Finance FOUND ELIGIBLE |
Tender Value
Refer Docs
Closing Date
27 Jan 2023, 2:00 pmClosed
Executive Engineer, MID Akhnoor Nowshera
Office of Executive Engineer, MID Akhnoor Nowshera
Replacement by Providing/Fitting , Installation, testing and commissioning of 10 cusecs discharge pump 18 mtr. Head H.C. Pump coupled with suitable rating induction Motor with all other allied works at LIS Manda I
2023_IFC_202330_1
MID/AN/170
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
60 days
AKHNOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Office of Executive Engineer, MID Akhnoor Nowshera
Exempted
Office of Executive Engineer, MID Akhnoor Nowshera
11 Feb 2023
12 Jan 2023
28 Jan 2023
12 Jan 2023
27 Jan 2023
14 Jan 2023
14 Jan 2023
Dismantling of the 10 cusec discharge 18 mtr head HC pump ( 6 ft x3.5 ft x3.0 ft) at lift irrigation station Manda-I by way of demounting the pumping machinery from the bed plate after removing the pump, motor ,electric connections, coupling pulleys, suction and delivery pipes and finally removing the base frame . Breaking the damaged RCC foundation block with the help of chisel, concrete cutter , electric jack hammer , tools/tackles. Cutting of steel members with the help of cutter stepwise during the process of breaking the RCC block and stacking. Completely removal of broken concrete, soil and TMT bars from pump room in such way that the machinery and electric equipments of other pumping machinery are not damaged /effected. Disposal of salvage/debris of dismantled foundation away from pump room to such a place where irrigation land and water source is not polluted. Laying of new RCC foundation block of size – 6 ft length x 3.5 ft width x 3.0 ft depth by way of making surface even for laying of new RCC foundation block. Fabrication of steel mesh out of 10 mm TMT bars members placed vertically and horizontally at equidistance of 6 inches. Laying of 6 inch concrete base at the bottom to level the surface . Placing of fabricated iron mesh in foundation pit and leveling / aligning it with pumping unit. Fabrication and grouting of 8 no. foundation bolts of size 3 ft in foundation block . Laying of RCC foundation block of size 6 ft x 3.5 ft x 3 ft by filling the concrete in the ratio of 1:1.5:3. The size of the block above the ground level should be of original size and alignment in respect of suction and delivery pipes. The block shall be filled with rich mixture of concrete with using vibrator for compaction. The entire block as one unit is to be laid in such a way that it can damp all types of mechanical vibrations created by dynamic load of pumping unit without causing any defect to the pumping unit as well as to the block itself. Fixing of the base frame after leveling and fastening with foundation bolts . Complete job includes cost of material such as cement , sand, steel gravel , shuttering charges, charges for concrete mixture , vibrator charges and labour charges of skilled as well as semi skilled labour , curing charges. The material has to be carried to Lift irrigation station from crusher . Providing, fitting, installation, testing and commissioning of raw water 10 cusec discharge x 18 mtr head pump with motor , coupling pulley and base frame at lift irrigation station Manda-I. The Job includes shifting of pumping unit to Lift irrigation station Manda-I by mechanical transport . Unloading of pumping unit at the site of Lift irrigation station and then shifting the same inside the pump room manually. Fitting and installation of 10 cusec discharge x 18 mtr head pump with motor , coupling pulley and base frame on the foundation bolts of the newly laid foundation with the help of nuts, bolts and washers. Job includes modification in suction and delivery pipe as per site condition. Fastening of the MS suction pipe and delivery pipe to the suction and delivery side of pump by using nut,bolts,washers and rubber packing . Checking the alignment with the help of tools and tackles Making of electrical connections to the motor . Priming the newly installed pumpset and testing of the pumping unit on load ,Complete Job includes cost of material , consumable, handling loading, unloading , transportation charge , labour charges for both skilled/semiskilled labour and hiring charges for crane , tripod stand , tools and tackles required during the execution of the job at site. Recommended make of pump:-Any reputed make as per IS standards. Type of Pump :- Mixed flow, split casing pump Type of water-: cold water, silt laden,raw water(fresh raw water) . Recommended make of Motor:- Three phase induction motor 100 HP rating compatible with Pump of any reputed make as per IS standards. Material of construction :- 1. Impeller- Cast iron 2. Pump Shaft - Stainless steel 3. Wearing Ring - Cast iron 4. Pump casing - Cast iron 5. Base frame – Mild steel. 6. Gland- Cast iron
GANPATI ELECTRICAL AND MECHANICAL WORKS
SUNIL KUMAR SURI CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .