| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC 3 358 A BAGAWATH SINGH ROAD PARAMAKUDI RAMANATHAPURAM 623707 | PARAMAKUDI | RAMANATHAPURAM | TAMIL NADU | 623707 | ₹4.0 L | 1 | Accepted-AOC work awarded |
| 2 | 2₹4.8 LRejected-Finance 2 2F NORTH SALAPATTI THIRUVELLARAI VIA MANACHANALLUR TK TRICHY DT | MANACHANALLUR | TRICHY | TAMIL NADU | ₹4.8 L | 2 | Rejected-Finance finance bid rejected |
| 3 | 3₹5.0 LRejected-Finance | ₹5.0 L | 3 | Rejected-Finance finance bid rejected |
| Sl No | Description | Qty | Unit | guadalupe associates L1 | M.Thangaraj L3 | T GOVINDARAJAN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavating and HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B as directed by Board Engineer in charge including cost of hire charges of required machinaries,labour, lead, lift, etc., complete. | 17.37 | M3 | 225 ₹3,908.25 | 82 ₹1,424.34 | 220 ₹3,821.40 |
| 1.10 | Supplying and filling the basement with 'M' sand for foundation and basement including watering, consolidation etc. as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 2.77 | M3 | 1,425 ₹3,947.25 | 53 ₹146.81 | 1,600 ₹4,432 |
| 1.20 | Plain cement concrete 1:4:8 using 40mm HBG metal for foundation and basementas as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 3.05 | M3 | 4,600 ₹14,030 | 11 ₹33.55 | 5,095 ₹15,539.75 |
| 1.30 | Random rubble masonry in CM 1:6 for foundationas (Below ground level) directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 6.03 | M3 | 4,700 ₹28,341 | 406 ₹2,448.18 | 4,700 ₹28,341 |
| 1.40 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement. | 8.11 | M3 | 40 ₹324.40 | 353 ₹2,862.83 | 33 ₹267.63 |
| 1.50 | Random rubble masonry in CM 1:6 for foundationas (Above ground level) directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 3.89 | M3 | 4,750 ₹18,477.50 | 313 ₹1,217.57 | 4,700 ₹18,283 |
| 1.60 | Supply and gravel filling under plinth area including cost of garvel when obtain from outside area including its carriage including watering ramming in 20 cm layers and dressing of earth etc. as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 16.52 | M3 | 425 ₹7,021 | 292 ₹4,823.84 | 700 ₹11,564 |
| 1.70 | Supplying, fabricating and placing in position of TMT rods of ISI make for reinforcement for R.C.C works including cutting, bending, placing in position and tieing, including cost of steel, binding wire, as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. | 0.2 | MT | 80 ₹16 | 1,800 ₹360 | 90,000 ₹18,000 |
| 1.80 | Reinforced cement concrete with M20 grade concrete for Plinth beam using 12 to 20 mm HBG machine crushed metal including cost of cement, all materials, labour, curing, vibration charges, all leads, lifts, as per standard specification, etc., complete. (but excluding cost of shuttering and steel reinforcement.) | 1.05 | M3 | 9,900 ₹10,395 | 1,450 ₹1,522.50 | 9,000 ₹9,450 |
| 1.90 | Brick on edge in Cement Mortar 1:4 using II-Class stock brick chamber burnt of size 9” x 4 3 / 8”x 2-3 / 4” for Foundation and Basement and all floor at all levels including cost of all materials, leads, lifts, labour etc., complete. | 0.39 | M3 | 5,550 ₹2,164.50 | 1,230 ₹479.70 | 6,450 ₹2,515.50 |
Tender Value
Refer Docs
EMD Value
₹4,923
Closing Date
29 Dec 2025, 2:00 pmClosed
Superintending Engineer/DEDC/Dindigul
O/o Superintending Engineer,DEDC,Dindigul
New work for the construction of New Toilet Block Providing brick work, supplying and fixing of Asbestos cement concrete sheets, Supply and fabrication and erection of steel rafters , Purlins,Granite stone partition,Flooring and white washing etc
2025_EB_629596_1
ETC.NO.21(25-26)
Open Tender
Civil Works
DINDIGUL
Please refer tender specification
3 documents required · 3 mandatory
₹0
₹4,923
27 Mar 2026
11 Dec 2025
30 Dec 2025
11 Dec 2025
29 Dec 2025
11 Dec 2025
Earth work excavating and HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B as directed by Board Engineer in charge including cost of hire charges of required machinaries,labour, lead, lift, etc., complete.
Supplying and filling the basement with 'M' sand for foundation and basement including watering, consolidation etc. as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Plain cement concrete 1:4:8 using 40mm HBG metal for foundation and basementas as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Random rubble masonry in CM 1:6 for foundationas (Below ground level) directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement.
Random rubble masonry in CM 1:6 for foundationas (Above ground level) directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Supply and gravel filling under plinth area including cost of garvel when obtain from outside area including its carriage including watering ramming in 20 cm layers and dressing of earth etc. as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Supplying, fabricating and placing in position of TMT rods of ISI make for reinforcement for R.C.C works including cutting, bending, placing in position and tieing, including cost of steel, binding wire, as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Reinforced cement concrete with M20 grade concrete for Plinth beam using 12 to 20 mm HBG machine crushed metal including cost of cement, all materials, labour, curing, vibration charges, all leads, lifts, as per standard specification, etc., complete. (but excluding cost of shuttering and steel reinforcement.)
Brick on edge in Cement Mortar 1:4 using II-Class stock brick chamber burnt of size 9” x 4 3 / 8”x 2-3 / 4” for Foundation and Basement and all floor at all levels including cost of all materials, leads, lifts, labour etc., complete.
Brick work in Cement Mortar 1:5 using II-Class stock brick chamber burnt of size 9” x 4 3 / 8”x 2-3 / 4” for Foundation and Basement and all floor at all levels including cost of all materials, leads, lifts, labour etc., complete.
115 mm thick Brick work in CM 1:3 using II nd class country bricks for wall as directed by Board Engineer in charge including cost of all materials, labour, scaffolding charges, lead, lift, etc., complete.
Supplying, fitting and fixing Solid PVC Door Shutters using 19 Gauge 19mm MS square tubes for styles and outer frames. 15mm MS square tubes for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC Sheets. Shutter using 5mm thick solid PVC Sheets for panelling shall rigidly fixed in position including necessary furniture and fittings. The over all size of styles shall be 50mm x 30mm. The over all size of top rail, lock rail and bottom rail shall be 75mm x 30mm. The over all size of frames shall be 50mm x 45mmwith suitable rabate for housing the shutter as directed by Board Engineer in charge including cost of materials, all leads, lifts, labours for fixing in position etc., complete. (Door Size:0.75*2.10 M)
FRP Door Sutter with FRP Door Frames made out of FRP Sheets of 3mm thick of over all size 65mm x 50mm with rebate suitably reinforced using MS Angle / Flats, cost of holdfasts and Solid Core FRP Shutter Panel of 5mm thick and hollow core frames of 3m wall thickness for styles and rails etc., of sizes specified by Engineers (1.0 MX2.10M)
Pointing with CM 1:3 in Existing CR masonry 20mm thick including cost of all materials, labour, lead,lift, T&P etc complete
Plastering with Cement motor in CM 1:4 10mm thick for wall surface for outside and inside all levels as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Outer Plastering
Inner Plastering
Supply, Fabrication and erection of steel rafters, purlins as directed by the department as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing of Asbestos cement concret sheets,6mm thick of approved quality with necessary screws as directed by the Department Enginner in chaarge cost of all materials lead, lift, T&Ps etc., complete.
Farbricating supplying and fixing in posotion of M.S. Ventilator of size 0.60 x 0.45m inclunding all material such as frame of size ISA 35x35x6 mm, louvered with MS flat 12 x 3 mm to hold glass panes of 5.5 mm thick, 16 mm dia M.S rods, holfasts, hinges, labour charges for fabricating as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete. fixing in position, all leads, lifts, etc., complete but excluding painting.
Plain cement concrete 1:3:6 using 40mm HBG metal for foundation and basementas as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
Flooring with Non slip Ceramic tiles of of size 305 x 305 x 6 mm of all available with ISI make / best approved quality (in case ISI make not available) over the cement mortar 1:3, 20mm. thick and pointing with same colour cement / powder for toilet flooring as directed by Board Engineer in charge including cost of all materials, labour, lead, lift, etc., complete.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_755015.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid