Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.9 LAdmitted-Finance | ₹19.9 L | L1 | Admitted-Finance |
| 2 | L2₹20.8 L+₹85,431.08 (4.29%)Admitted-Finance | ₹20.8 L+₹85,431.08 (4.29%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS ENTERPRISES L2 | Srinivash Engineers L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/ dense soil for foundation of poles, structures, stay rods, laying of underground cable etc complete all as directed. | 53.46 | Cum | 413 ₹22,078.98 | 300 ₹16,038 Lowest |
| 2.00 | Excavation in trenches not exc. 1.5M wide and exc.1.5M & upto 3.0M in depth for foundation of stay/ pole and etc and getting out in hard/dense soil complete all as specified and as directed. | 1.46 | Cum | 563 ₹820.85 | 350 ₹510.3 Lowest |
| 3.00 | Returning, filling in soils including spreading, leveling, watering and well ramming in layers each not exceeding 25cm thick complete all as directed. | 30.89 | Cum | 263 ₹8,122.95 | 55 ₹1,698.72 Lowest |
| 4.00 | Removing excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as directed. | 17.71 | Cum | 263 ₹4,658.85 | 65 ₹1,151.43 Lowest |
| 5.00 | Spreading riddled earth ( after preparation of excavated earth) in Cable duct with sand cushioning of cable laid in trenches complete all as directed. Note:- Punned thickness 18 CM( 6.25 Cm below cale and 11.75 cm above cable) will be measured for payment purpose. Quoted rate inclusive of all arrangement as mentioned. | 12.96 | Cum | 253 ₹3,278.88 Lowest | 300 ₹3,888 |
| 6.00 | M&L in repairs for laying un-reinforced precast concrete cable cover, class HV , type 1 with , size 300 mmX180mmX 40mm complete all as directed. | 666.67 | Each | 33 ₹22,000 | 23 ₹15,333.33 Lowest |
| 7.00 | M&L in repairs for cement concrete in foundation (1:4:8) type D2 using 40 mm graded broken stone aggregate for base of foundation complete all as specified and as directed. | 0.49 | CUM | 4,633 ₹2,251.64 | 4,550 ₹2,211.3 Lowest |
| 8.00 | M&L in repairs for cement concrete in foundation (1:3:6) type C2 using 40 mm graded broken stone aggregate including form work complete all as specified and as directed. | 2.71 | CUM | 4,933 ₹13,352 Lowest | 5,500 ₹14,886.69 |
| 9.00 | M&L in repairs for PCC (1:2:4) type B1 (using 20mm graded stone aggregate) as in coping including necessary formwork complete all as specified and as directed. | 0.47 | Cum | 5,233 ₹2,452.27 | 5,000 ₹2,343.08 Lowest |
| 10.00 | Supply and laying in replacement of GI tube 100 mm dia, light grade for cable protection at road crossing / on poles and tubing sealed at both ends after laying the cables complete all as directed. | 12 | RM | 753 ₹9,036 | 450 ₹5,400 Lowest |
Tender Value
₹22 L
EMD Value
₹44,000
Closing Date
25 Jul 2026, 6:00 pmClosed
CWE(ARMY) SECUNDERABAD
Commander Works Engineers Mudfort, MES Office Complex Secunderabad-500 003
REPAIR/ MAINTENANCE OF OVERHEAD (OH) LINES AND UG CABLES, INCLUDINNG ROUTINE PREVENTIVE AND BREAKDOWN MAINTENANCE OF TRANSFORMERS, AB SWITCHES, LIGHTNING ARRESTERS (LAS) EARTHING SYSTEMS AND ALL ASSOCIATED ALLIED ELECTRICAL WORKS
2026_MES_773529_1
86325
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
SECUNDERABAD
as per NIT
7 documents required · 7 mandatory
₹500
GE(UTILITY) Secunderabad
₹44,000
Yes
4 Aug 2026
22 Jun 2026
1 Aug 2026
22 Jun 2026
25 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches not exceeding 1.5m wide and not exceeding 1.5m in depth and getting out in hard/ dense soil for foundation of poles, structures, stay rods, laying of underground cable etc complete all as directed. | 53.46 | Cum | - | - |
| 2 | Excavation in trenches not exc. 1.5M wide and exc.1.5M & upto 3.0M in depth for foundation of stay/ pole and etc and getting out in hard/dense soil complete all as specified and as directed. | 1.46 | Cum | - | - |
| 3 | Returning, filling in soils including spreading, leveling, watering and well ramming in layers each not exceeding 25cm thick complete all as directed. | 30.89 | Cum | - | - |
| 4 | Removing excavated soil to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5m above the starting point complete all as directed. | 17.71 | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tender86325.pdf
Tender Documents • 1.06 MB
BOQ_866129.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .