Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON W MUMBAI 400 104 | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹31.1 L Quoted ₹31.4 L | L1 | Accepted-AOC Quoted rates are satisfactory |
| 2 | L2₹32.5 LRejected-Finance SHOP NO 106 1ST FLOOR ASHOKA SHOPPING CENTRE LT ROAD MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | ₹32.5 L | L2 | Rejected-Finance Greater Than L1 |
| 3 | L3₹32.8 LRejected-Finance 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹32.8 L | L3 | Rejected-Finance Greater Than L1 |
| 4 | L4₹33.0 LRejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | ₹33.0 L | L4 | Rejected-Finance Greater Than L1 |
| 5 | L5₹33.1 LRejected-Finance FLAT NO 404 A WING HILL SIDE RESIDENCY BEHIND KIRTI POLICE SOCIETY KATRAP BADLAPUR EAST DIST THANE MAHARASHTRA 451503 | 451503 | ₹33.1 L | L5 | Rejected-Finance Greater Than L1 |
| Sl No | Description | Qty | Unit | tulsani associates L6 | sapana enterprises L3 | Shree Ayyappa Engineering L1 | pk Enterprises L2 | shakti engineering and electrical works L4 | T.H.ASSOCIATES L7 | M/S SOMANATH ENTERPRISES L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing services for operation and maintenance of AC plant of capacity 2 x 11 TR (chiler with compressor unit) at DAG(DEW) AC plant in one shift of 08 Hrs (from 0800 hrs to 1600 hrs) (including Sundays and Holidays) with one operator(REF MECH) checking the proper operation of compressor,condensor ,AHU with desired temperatures and making sure of the pumps safe operation of the butterfly valves ,gland tightening for reducing water leakage and properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice complete all as specified and as directed by Engineer-in-Charge. | 334 | shift | 1,230 ₹4.1 L | 1,250 ₹4.2 L | 1,125 ₹3.8 L | 1,200 ₹4.0 L | 1,126 ₹3.8 L | 1,240 ₹4.1 L | 1,200 ₹4.0 L |
| 2.00 | Providing services for operation and maintenance of AC plant of capacity 3 x 28 TR (2 working & one stand by) at SEACON (CCEL) AC plant in one shift of 08 Hrs (from 0800 hrs to 1600 hrs) (inluding Sundays and Holidays) with one operator (Ref mech) complete also operation of diesel engine generating set, 125 KVA capacity at CCEL site including cleaining of the eqpt, checking of starting battery for proper charge, checking of electrical panel for proper functioning opening the diesel tank for filling in diesel, collection of diesel as and when reqd from MT Section of AGE E/M yard, transporting to site, operate the DG set as reqd by user when main supply fails, switch off DG supply after main supply resumes, properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice complete all as specified and as directed by Engineer-in-Charge. | 334 | shift | 1,230 ₹4.1 L | 1,250 ₹4.2 L | 1,125 ₹3.8 L | 1,200 ₹4.0 L | 1,126 ₹3.8 L | 1,240 ₹4.1 L | 1,200 ₹4.0 L |
| 3.00 | Providing services for operation and maintenance of AC plant of capacity 20 x 2 TR at LM 2500 and Diesel engine generating set, 40 KVA capacity at Buriya simulator in one shift of 08 Hrs (from 0800 hrs to 1600 hrs) with one operator(REF MECH) checking the proper operation of compressor,condensor ,AHU with desired temperatures and making sure of the pumps safe operation of the butterfly valves ,gland tightening for reducing water leakage and properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice including cleaining of the eqpt, checking of starting battery for proper charge, checking of electrical panel for proper functioning opening the diesel tank for filling in diesel, collection of diesel as and when reqd from MT Section of AGE E/M yard, transporting to site, operate the DG set as reqd by user when main supply fails, switch off DG supply after main supply resumes, properly lock and unlock plant run safely complete as directed and maintaining log sheet as per standard practice complete all as specified and as directed by Engineer-in-Charge. Note:- DHPP shall be issued under Sch 'B' free of cost.
Note :- Diesel shall be issued under Sch 'B' free for use as and when required.
1. Contractor should provide safety shoes,one pair of uniform,helmet,safety glasses &safety gloves etc for each working operator
2. Contractor should provide torch light,grass cutting blade,01 No .axe,first aid box etc for each plant.
3. The Employed labours are wholely responsible for area cleaning i.e grass removing, complete cleaining of plant rooms and other task given by JE/Engr In Charge.
4.Contractor shall provide log book for each plant and also employed person should be maintained on daily basis.
5.Contractor shall putup each plant record book weekly once to JE/Engr-in -charge. | 334 | shift | 1,230 ₹4.1 L | 1,250 ₹4.2 L | 1,125 ₹3.8 L | 1,200 ₹4.0 L | 1,126 ₹3.8 L | 1,240 ₹4.1 L | 1,200 ₹4.0 L |
| 4.00 | Supply and fix for following spares suitable for compressor - Model 465 - INHS Kasturi :-
Piston | 2 | Each | 1,840 ₹3,680 | 1,821 ₹3,642 | 1,800 ₹3,600 | 1,811 ₹3,622 | 1,801 ₹3,602 | 1,900 ₹3,800 | 1,848 ₹3,696 |
| 5.00 | Piston rings | 12 | Each | 555 ₹6,660 | 536 ₹6,432 | 515 ₹6,180 | 526 ₹6,312 | 516 ₹6,192 | 555 ₹6,660 | 563 ₹6,756 |
| 6.00 | Oil rings | 12 | Each | 555 ₹6,660 | 536 ₹6,432 | 515 ₹6,180 | 530 ₹6,360 | 524 ₹6,288 | 555 ₹6,660 | 563 ₹6,756 |
| 7.00 | Connecting rod bearing (set of four) | 4 | Set | 4,570 ₹18,280 | 4,551 ₹18,204 | 4,530 ₹18,120 | 4,545 ₹18,180 | 4,539 ₹18,156 | 4,570 ₹18,280 | 4,578 ₹18,312 |
| 8.00 | Main end rod bearing with washer | 2 | Each | 4,570 ₹9,140 | 4,555 ₹9,110 | 4,530 ₹9,060 | 4,545 ₹9,090 | 4,539 ₹9,078 | 4,570 ₹9,140 | 4,568 ₹9,136 |
| 9.00 | Seal end rod bearing with washer | 2 | Each | 1,832 ₹3,664 | 1,825 ₹3,650 | 1,800 ₹3,600 | 1,815 ₹3,630 | 1,809 ₹3,618 | 1,832 ₹3,664 | 1,838 ₹3,676 |
| 10.00 | Liner assembly | 2 | Each | 802 ₹1,604 | 795 ₹1,590 | 770 ₹1,540 | 785 ₹1,570 | 779 ₹1,558 | 802 ₹1,604 | 808 ₹1,616 |
Tender Value
₹32.3 L
EMD Value
₹64,500
Closing Date
3 Nov 2025, 6:00 pmClosed
Gaurav Tiwari, IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
PROVISION OF SERVICES FOR OPERATION OF AC PLANTS REP MAINT TO CENTRAL AC PLANTS AND COOLING APPLIANCES AT INS SHIVAJI
2025_MES_734743_1
GE/LONAVLA/8330/E8
Open Tender
Civil Works
334 days
GE (I) (NAVY) LONAVLA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE (I) (NAVY) LONAVLA
₹64,500
Yes
31 Jan 2026
11 Oct 2025
5 Nov 2025
11 Oct 2025
3 Nov 2025
27 Oct 2025
11 Oct 2025 - 25 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
8330Tenderdocumentfinal.pdf
Tender Documents • 1.00 MB
BOQ_822746.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid