Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹12.5 L+₹59,842.40 (5.02%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹12.5 L
EMD Value
₹25,020
Closing Date
30 Aug 2021, 4:00 pmClosed
Divisional Forest Officer Leh
Divisional Forest Office, Forest Division Leh Fort Road UT Ladakh
Construction Poly carbonate green house at Badami Nursery of Leh Forest Range for the year 2021-22 under (S.D.P Up gradation of Nurseries On Going Scheme).
2021_FEE_4129_1
E-Tender (26) of FDL 2021-22
Open Tender
Civil Works - Others
Works
60 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Divisional Forest Officer Leh Ladakh
₹25,020
10 Sept 2021
16 Aug 2021
1 Sept 2021
16 Aug 2021
30 Aug 2021
16 Aug 2021
Amount
Earth work in excavation by mechanical means (hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm 0n plan) including disposal of excavated earth, lead up to 50m and lift upto 1.5m All kind of soil Ground level 1x60’.00”×24’.00”x 3’.00”= 4320cfts Foundation level: 2x60’.00”×2’.6”x 1’.6”= 450.00cfts 2x24’.00”×2’.6”x 1’.6”= 180.00cfts =T 4950.00cfts or 140.08 cum
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) 1x60’.00”×2.6” x1’.6”= 225.00cum 2x24’.00”×2’.6” x1’.6”=180.00cum L/W U/ ground 1x 60’.0” x2’.00”x 9’.0”= 1080.00cfts 1x 60’.0” x2’.00”x 4’.00”)= 480.00cfts S /A/ground =2x3.’0”x2’.0”x9’.6=114.00cfts 2x21.’0”x2’.0”x(9’.0”+4’.0”/2)=546.00cfts T= 2625.00cfts ----(i) Construction of step 3x2’.00”×1.3’.00”x 0’.6”= 3.75cfts-----(ii) T= 2628.75 or 74.39cum--------(A) D/d of door and window portion door: 1x6’.00”x 2’.9”x 2’.0”=33.00sfts window=1x 2’.00”x2’.00”x1’.6”=6.00sfts total = 39.00cfts or 1.10cum--------(B) A-B= 74.39 –1.10 cum =73.29 cum Including cost of material and carriage job.
Providing and laying DPC 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) Nallah 2x60’.00”×2.6” = 300.00sqfts 2x24’.00”×2’.6” =120.00sqfts 2x60’.00”×2.0” = 240.00sqfts 2x24’.00”×2’.0” =96.00sqfts Total= 756.00sqfts or 70.26sqm (Including cost of material and carriage complete job)
Providing and fixing of G.I sheet of 6mm GI roof: a slope to the north with rust resistant pre coated sheet GI sheet top with layer of hay and soil, 60.00x 3.6 =216 sqfts .(Including cost of material and carriage complete job.)
The rectangular MS pipes, 80x25x3 mm including cutting, duly bended in required shape at 4’.7”-5’.00” distance horizontally and 3’.2”-3’.6” distance vertically from angle to angle complete as per requirement to fix the joints are welded /nut bolted with each other, MS rectangular pipes are paint with one coat of red oxide and enameled paints. 75x25x3= 11800rfts or 2340kgs Including Cost of material and Carriage complete job.
poly carbonate sheet: - The total rectangular square pipe structure is covered with UV2 stabilized polycarbonate sheet of 16mm, triple layer of 110sqm meterarea fixed with 20x3mm aluminum T beading and sealed properly with silicon sealant at each joint (60x24x9.5) (Including Cost of material and Carriage complete job)
15mm thick cement plaster on rough side of stone wall of mix 1:4(1 cement: 6 Fine sand) 2x60’.0”x9’.0” =1080.00sqfts 2x60’.0”x3’.0” =360.00sqfts 2x3’.0”x9’.0= 54.00sqfts 2x21’.0”x (9’.0” +4.’0”/2) =273.00sqfts Total= 1767.00sqfts or 164.21sqm .(including cost of material and carriage complete job.)
Cost of metallic door and ventilator with hook for extra cover during winter. Door: 1x 6.00x 2.9=16.25sfts Window= 3x 2.00x 2.00= 12.00sfts (including cost of material and carriage complete job.)
M/S JAMAL UD DIN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .