Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC Qualified For AOC | |
| 2 | L2₹8.6 L+₹74,637.92 (9.53%)Rejected-Finance | L2 | Rejected-Finance Disqualified |
Tender Value
₹8.3 L
EMD Value
₹8,300
Closing Date
6 Mar 2026, 5:30 pmClosed
Commissioner Of UMC
Chhatrapati Shivaji Bhavan Aagar Road Ujjain, UMC
Construction Of CC Road Work At Shitlamata Temple To Jaat Mohalla In W- 40
2026_UAD_483217_1
283/Zone 5/E-tender/2026
Open Tender
Civil Works - Roads
Percentage
60 days
hitlamata Temple To Jaat Mohalla
As Per Tender Document
4 documents required · 4 mandatory
₹2,000
₹8,300
29 Jun 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
6 Mar 2026
18 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means
including disposal of material within 50 meters lead as per direction
of Engineer-in-charge. | 14 | M3 | 534 | ₹7,476 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar
including stacking material within 50 meters lead. For thickness of tiles upto 25 mm | 100 | M2 | 27 | ₹2,700 |
| 3 | Excavationforroadwayinsoilbymanualmeansincludingloadingin tippersanddisposalwithallliftsandleadupto1000metersandasper relevant clauses of section-300. | 63.2 | M3 | 119 | ₹7,520.8 |
| 4 | Constructionof granularsub-base byprovidingCoarsegradedmaterial
(CBR>30),spreadinginuniformlayerswithmotorgraderonprepared
surface,mixingbymixinplacemethodatOMCandcompactingwith
vibratoryrollerof80-100KNStaticweighttoachievethedesireddensity,
complete in all respect as per relevant clauses of section-400. | 63.2 | M3 | 689 | ₹43,544.8 |
| 5 | ProvidingandlayingCementConcretegradeM-10Nominalmix1:3:6with
40mmgradedcrushedstoneaggregate,spreadingtheconcreteby
shovelsmixingshallbeinmechanicalmixer,compactingbyuseof
pin/plate/screedvibratorsincludingformworkbystrongsteelgirdersfixed
by spikes. | 63.2 | M3 | 3,890 | ₹2,45,848 |
| 6 | ProvidingandlayingCementConcretegradeM-20(Nominalmix1:1.5:3)
with20mmgradedcrushedstoneaggregate,mixingshallbein
mechanicalmixer,layingwithpavercompactingbyuseofpin,plate/
screedvibratorsincludingformworkbystrongsteelgirdersfixedby
spikes,separationmembrane125micronthick,i/ccuttingofjoints@4to
5 minterval&fillingitwithhotappliedbituminoussealant(withoutdowel
bars). (max. thickness 20cm) | 94.8 | M3 | 5,029 | ₹4,76,749.2 |
| 7 | Steel work in built up M.S. tubular section (round, square or
rectangular Hollow tube etc.) trusses/frame work etc./ railing work etc.
including cutting, hoisting fixing in position and applying a priming coat
of approved steel primer, welded and bolted including special shaped
washers etc. complete.Hot finished welded type tubes | 450.01 | Kg | 99 | ₹44,550.99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
tenderdocument.pdf
Tender Documents • 1.62 MB
BOQ_567897.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .