Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L Quoted ₹6.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.1 LRejected-AOC | ₹7.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | G.ANGAMUTHU CONTRACTOR L1 | PAVITHRA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Chipping of wall to made the surface rough including cost of all materials, lead, lift, T&P, etc.., complete as directed by site Engineer incharge at site. | 39.3 | m2 | 43 ₹1,689.90 | 45 ₹1,768.50 |
| 2.00 | Plastering with CM 1:5, 12mm thick for inside building including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by site Engineer incharge of the work. | 89.1 | m2 | 293 ₹26,106.30 | 300 ₹26,730 |
| 3.00 | Ceiling and inner wall colour washing with Interior Emulsion after thorough scrapping of old inner wall surface and ceiling applying two coats of Interior Emulsion paint of approved quality including cost of all materials, labour, lead, lift, T & P etc. complete and as directed by the Engineer at site. | 2,142 | m2 | 162 ₹3.5 L | 170 ₹3.6 L |
| 4.00 | Outer Colour washing two coats with Exterior Emulsion of approved quality including cost of all materials, labour, lead, lift, T & P etc. complete and as directed by the Engineer at site including cost of scaffolding. | 1,542 | m2 | 165 ₹2.5 L | 180 ₹2.8 L |
| 5.00 | Painting two coats of synthetic enamel paint for iron works including cost of all materials, Labour, lead, lift, T&P etc. complete and as directed by the engineer at site. | 20.6 | m2 | 60 ₹1,236 | 65 ₹1,339 |
| 6.00 | Earth work excavation in all soils, such as sand, silt, or other loose soil, light black cotton soil and ordinary earth including depositing the excavated earth away from the site with 1 Km lead over an initial lead of 10 m and a lift of 2m, levelling the area, including cost of all labour, lead, lift, etc complete. | 9 | m3 | 162 ₹1,458 | 170 ₹1,530 |
| 7.00 | Removal of sludge depositing away from the site with 1 Km lead over an initial lead of 10 m and a lift of 2m, levelling the area, including cost of all labour, lead, lift, etc complete. | 2.2 | m3 | 90 ₹198 | 95 ₹209 |
| 8.00 | Providing PCC 1:3:6 using O.P Cement and 20 mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete. | 1.6 | m3 | 6,970 ₹11,152 | 7,000 ₹11,200 |
| 9.00 | Brick work in CM 1:5 using Fly ash brick incliding cost of all materials, T&P, lead, lift etc., complete and as directed by Engineer in charge at site. | 4.05 | m3 | 6,975 ₹28,248.75 | 7,200 ₹29,160 |
Tender Value
Refer Docs
EMD Value
₹5,900
Closing Date
28 Jun 2024, 2:00 pmClosed
CE NCTPS II
Office of CE NCTPS II Chennai 120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance including colour washing to the CHP Building at NCTPS-II
2024_EB_454584_1
SE/CM/NCTPS-II/EE/CM/ 17/2024-25
Open Tender
Civil Works
90 days
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,900
Yes
3 Mar 2026
14 Jun 2024
29 Jun 2024
14 Jun 2024
28 Jun 2024
14 Jun 2024
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid