Loading…
Loading…
Tender Value
₹1.9 Cr
EMD Value
₹3.8 L
Closing Date
14 Oct 2026, 2:00 pm
Superintending Engineer
Office of the Superintending Engineer PWD BNH Diphu Building Circle Diphu
Establishment of ICT laboratory and residential hostels boys and girls at Residential English School Hamren West Karbi Anglong under ABP for Chinthong Block
2026_PWBNH_54104_1
SE(B)/TECH/ICT/01/2026-27
Open Tender
Civil Works - Building
Item Rate
365 days
Hamren West Karbi Anglong
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹3.8 L
Yes
Diphu
23 Sept 2026
23 Sept 2026
14 Oct 2026
23 Sept 2026
14 Oct 2026
23 Sept 2026
5 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BOYS HOSTEL
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kind of soil | 1,174.5 | cum | - | - |
| 2 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials
Ordinary or hard rock | 391.5 | cum | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 63.75 | cum | - | - |
| 4 | Providing brick soling in foundation and under floor with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materials and if necessary dewatering, complete.
Brick on flat soling. (With cement morter 1:4) | 117.68 | sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 fine sand derived from natural sources :10 graded stone aggregate 40 mm nominal size derived from natural sources) | 5.6 | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.35 | cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc for mass concrete | 53.25 | sqm | - | - |
| 8 | Columns, Pillars, Piers, Abutments, Posts and Struts | 54.9 | sqm | - | - |
| 9 | Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 176.12 | sqm | - | - |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand) | 25.59 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
hamrensbd.pdf
Tender Documents • 2.67 MB
DNITPDF.pdf
Tender Documents • 1.17 MB
BOQ_84975.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .