Tender Value
₹42.6 L
EMD Value
₹3.6 L
Closing Date
3 Jul 2026, 3:00 pm6d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
Nagar Nigam Firozabad
Beautification work of the pond in Ward No. 22 Aalani Nagar.
2026_DOLBU_1148317_265
05/PWD_15vitt_Rajvitt/2026-27
Open Tender
Civil Works
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,264
Municipal Corporation
₹3.6 L
24 Jun 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
3 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatring naala by using 5 to 10HP Pump …............Including all complete. | 480 | Sqm | 600 | ₹2,88,000 |
| 2 | Excavation in mud, sludge and silt loam, clay or and including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the reenches or in to the space between the bulilding and the side of foundation ……………................................. allcomplete | 777.6 | Cum | 187.5 | ₹1,45,800 |
| 3 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 205.73 | Cum | 150 | ₹30,859.5 |
| 4 | Disposal of malba from site with cartage up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2025-26, Chapter-3, Item No. 231a ) | 622 | Cum | 230.1 | ₹1,43,122.2 |
| 5 | Providing and laying cement concrete in 1:4:8 (1 cement: 4coarse sand :8 graded stone aggregate 40mm norminal size ) including supply of all materials, labour and T&P etc. (PWD SOR 2025-26 Chapter No-06 SI No. 3 Spec. No. 4.1) | 42.84 | Cum | 5,650 | ₹2,42,046 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 20.53 | Cum | 8,100 | ₹1,66,293 |
| 7 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 10.93 | Cum | 8,300 | ₹90,719 |
| 8 | Reinforced cement concrete work in beams, lintels, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). (PWD SOR 2025-26, Chapter-5, Item No.12) | 11.37 | Cum | 8,900 | ₹1,01,193 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).(PWD SOR 2025-26, Chapter-5, Item No.11 Spec. no. 5.2) | 24.97 | Cum | 9,000 | ₹2,24,730 |
| 10 | M-15 Brick work in 1:4 Cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (SOR/ PWD 2025-26 Chapter No. 6 SI No. 2)) | 41.5 | Cum | 5,500 | ₹2,28,250 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.04 MB
TD.pdf
Tender Documents • 6.85 MB
BOQ_2180499.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid