Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹38 L
Closing Date
3 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Dr Sujoy Saha Pr Scientist Project In charge CPP
ICAR National Research Centre For Grapes PB No 3 Post Manjari Farm Solapur Road Pune 412307 Maharashtra
Design and Build containment facility for grapes CPC 1 Pune
2026_DAREA_931233_1
CPC1-CW01 CPC Pune
Global Tenders
Civil Works
Lump-sum
ICAR National Research Centre For Grapes
Please refer Tender documents
4 documents required · 4 mandatory
₹0
₹38 L
ICAR National Research Centre For Grapes Pune
22 Oct 2026
22 Oct 2026
3 Dec 2026
22 Oct 2026
3 Dec 2026
3 Nov 2026
23 Oct 2026 - 2 Nov 2026
2 Nov 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Design and Build containment facility for grapes – CPC 1, Pune | |||||
| 1.01 | Design and Build of the containment facility for grapes – CPC 1 — comprising the construction and development of the containment facility. The project scope includes execution of Electrical Works, Plumbing Works and HVAC Systems along with all necessary support services and allied facilities. The project shall be executed in accordance with DBR/Specifications and Guidelines, relevant Indian Standard (IS) Codes, and as approved by ADB/NHB/ICAR/MoAFW and as per the directions of the Principal Scientist (Plant Pathology).
The scope also includes complete handing over of the facility and comprehensive Operation & Maintenance for a period of five (5) years, ensuring all works are completed in all respects.
(The project cost will be 85 % for design and build of the facility and 15% for the Operation and Maintenance of Services - Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years, including comprehensive warranty on the equipment, for the containment facility which will run concurrently with DLP of 12 Months).
(For implementation of site-specific EHSMP and EMoP at least 1.5 % of the total scope of works/quoted price shall be allotted for EHSMP and EMoP)
(A Provisional Sum (PS) of NR 1,50,00,000 or INR 1.5 crore will be added as a separate item over and above of the quoted amount while awarding the contract agreement for miscellaneous expenses. This PS will not be part of the stages of payment). | 1 | Lump Sum | 1.25 | 1.25 |
| 2EHS Management Plan and Environmental Monitoring | |||||
| 2.01 | Preparation of EHS Management Plan (EMP)
Preparation, submission, approval, and implementation of Contractor’s Environmental, Health and Safety (EHS) Management Plan in accordance with contract requirements, including site-specific Environmental Management Plan (EMP), method statements, risk assessments, emergency response procedures, and EHS Code of Conduct; including deployment of qualified EHS personnel, monitoring, reporting, and compliance with statutory and ADB Safeguard Policy requirements.
The rate shall include all costs for preparation, approvals, implementation, periodic updates, staff, training, documentation, and reporting throughout the contract period. | 1 | Lump Sum | 1.25 | 1.25 |
| 2.02 | Environmental Monitoring Plan Implementation
Implementation of Environmental Monitoring Plan including baseline and periodic monitoring of environmental parameters (air, water, noise, waste, etc.) as specified in the contract; provision of monitoring equipment, sampling, laboratory testing, documentation, and submission of monitoring reports in formats acceptable to the Engineer and Employer. | 1 | Lump Sum | 1.25 | 1.25 |
| 2.03 | Occupational Health and Safety (OHS) Compliance
Provision and maintenance of Occupational Health and Safety measures including supply of personal protective equipment (PPE), site safety arrangements, worker welfare facilities, safety signage, toolbox talks, training programs, incident reporting, and compliance with applicable labor and safety regulations and contract EHS provisions. | 1 | Lump Sum | 1.25 | 1.25 |
| 2.04 | Deployment of EHS Personnel
Deployment of qualified Environmental, Health and Safety (EHS) Officer(s) at site for the entire duration of the works, including supervision of EHS compliance, coordination with Engineer, reporting, audits, and corrective actions as per contract requirements. | 18 | Months | 1.25 | 22.5 |
| 2.05 | Waste Management and Disposal
Collection, segregation, transportation, and disposal of construction and hazardous waste in accordance with approved Waste Management Plan, statutory regulations, and contract provisions; including documentation and disposal certificates. | 1 | Lump Sum | 1.25 | 1.25 |
| 2.06 | Site Restoration and Environmental Safeguards Compliance
Final site cleanup, restoration, and compliance with environmental safeguard requirements including removal of temporary facilities, disposal of residual waste, reinstatement of disturbed areas, and submission of completion reports. | 1 | Lump Sum | 1.25 | 1.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BiddocumentCPC1CW01DesignandBuildcontainmentfacilityforgrapesPune.pdf
Tender Documents • 2.24 MB
IndicativeSitePlanCPCPune.pdf
Additional Documents • 0.93 MB
BOQ_978606.xls
BOQ • 0.32 MB
GeoTechReportCombined.pdf
Additional Documents • 4.46 MB
EnvironmentalReport.pdf
Additional Documents • 3.01 MB
Responses_of_Pre_bid_CW-01_PPFD.pdf
PDF • 0.28 MB
PreBidmeetinglink.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .