| Sl No | Description | Qty | Unit | Gaikhonlung Panmei L2 | Irom Khogen Singh L3 | Md Kheirudin L1 |
|---|---|---|---|---|---|---|
| 1.00( A ) Building( Ground Floor ) | ||||||
| 2.00SH : EARTH WORK | ||||||
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 525.41 | m3 | 550 ₹2,88,975.5 | 565 ₹2,96,856.65 | 530 ₹2,78,467.3 Lowest |
| 4.00 | b) Lift above 1.5 m to 3.00 m | 346.15 | m3 | 655 ₹2,26,728.25 | 670 ₹2,31,920.5 | 630 ₹2,18,074.5 Lowest |
| 5.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 290.52 | m3 | 230 ₹66,819.6 | 240 ₹69,724.8 | 225 ₹65,367 Lowest |
| 6.00 | Supplying and filling in plinth with sandy soil under floors i/c watering, ramming consolidating and dressing complete | 184.91 | m3 | 1,280 ₹2,36,684.8 | 1,320 ₹2,44,081.2 | 1,235 ₹2,28,363.85 Lowest |
| 7.00SH : CONCRETE WORKS | ||||||
| 8.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:5:10 (1 cement : 5 dimapur coarse sand : 10 graded stone aggregate 40 mm nominal size) | 83.98 | m3 | 12,520 ₹10,51,429.6 | 12,875 ₹10,81,242.5 | 12,070 ₹10,13,638.6 Lowest |
| 9.00SH : R.C.C. WORKS | ||||||
| 10.00 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :(a)1:1.5:3 (1 cement : 1.5 dimapur coarse sand : 3 graded stone aggregate 20 mm nominal size) | 145.77 | m3 | 16,360 ₹23,84,797.2 | 16,830 ₹24,53,309.1 | 15,770 ₹22,98,792.9 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
18 Aug 2026, 1:00 pmClosed
Executive Engineer-V
MPHC Office complex
C/O Battalion Headquarters for newly raised 11th IRB at Saivom Village, Tengnoupal District for the Financial Year, 2024-25 (Phase I) SH Construction of 100 S.M. Barrack Block B (Ground Floor)
2026_MPHCL_3440_1
EE(V)/MPHC/2026-27/TPL/03
Open Tender
Civil Works
Works
365 days
As per tender documents
As per tender document
3 documents required · 3 mandatory
₹25,000
MPHC Ltd. (SD/PG)
₹4.2 L
8 Sept 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
18 Aug 2026
12 Aug 2026
12 Aug 2026 - 18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | ( A ) Building( Ground Floor ) | - | - | - | - |
| 2 | SH : EARTH WORK | - | - | - | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 525.41 | m3 | 1 | ₹525.41 |
| 4 | b) Lift above 1.5 m to 3.00 m | 346.15 | m3 | 1 | ₹346.15 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 290.52 | m3 | 1 | ₹290.52 |
| 6 | Supplying and filling in plinth with sandy soil under floors i/c watering, ramming consolidating and dressing complete | 184.91 | m3 | 1 | ₹184.91 |
| 7 | SH : CONCRETE WORKS | - | - | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :(a) 1:5:10 (1 cement : 5 dimapur coarse sand : 10 graded stone aggregate 40 mm nominal size) | 83.98 | m3 | 1 | ₹83.98 |
| 9 | SH : R.C.C. WORKS | - | - | - | - |
| 10 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :(a)1:1.5:3 (1 cement : 1.5 dimapur coarse sand : 3 graded stone aggregate 20 mm nominal size) | 145.77 | m3 | 1 | ₹145.77 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Documents.pdf
Tender Documents • 28.05 MB
ScheduleMaterials.pdf
Additional Documents • 0.76 MB
Drawing.pdf
Additional Documents • 7.70 MB
BOQ_3746.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .