Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹8.2 Cr
EMD Value
₹8.2 L
Closing Date
30 Nov 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CCE Phulbani (R and B) Circle Phulbani
Office of the CCE Phulbani R and B Circle Phulbani District Kandhamal PIN 762001
Improvement of Tarava to Kantamal road from 0/000 Km to 5/459 Km in the District of Boudh under State Plan
2026_EICCL_146112_1
CCE-R and B-PLB-08 of 2026-27
Open Tender
Civil Works - Roads
Percentage
240 days
Boudh
Please Refer Tender Documents
2 documents required · 2 mandatory
₹10,000
₹8.2 L
Yes
16 Nov 2026
16 Nov 2026
1 Dec 2026
16 Nov 2026
30 Nov 2026
16 Nov 2026
16 Nov 2026 - 27 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Road Proper
Scarifying and removing existing bituminous surface to a required depth and dispoasl of scarified materials within all lifts and lead upto 1000 mtrs as per technical specififcation as per Clause 501.8, 305.3.4 & all relevant sections / clauses of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge. | 24,019.6 | sqm | 6.08 | ₹1,46,039.17 |
| 2 | Reworking the scarified bituminous surface suitably after supplementing the base materials with sand and compacting finished surface as per approved drawing and techinical specificationa as per section 900 and Clause 501.8 and all relevant sections / clauses of MoRT&H Specification for Road and Bridge works (5th Revision) and including all cost i.e cost of all materials ,all labour, all T&P , royality etc complete in all respect as per the direction of Engineer - in - Charge | 24,019.6 | sqm | 12.07 | ₹2,89,916.57 |
| 3 | Clearing and grubbing road land including uprooting vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per section 200, clause 201 of the MoRT&H Specifications for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer- in- charge. | 16,377 | sqm | 8.74 | ₹1,43,134.98 |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and as per clause -305 of MoRT&H Specification for Road & Bridge works (5th Revision) including all cost i.e cost of all materials, all labour, all T&P etc complete and as per direction of the Engineer - in - Charge. | 1,209.6 | cum | 35.88 | ₹43,400.45 |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per approved Drawing & Technical Specifications and as per Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). including all cost i.e cost of all materials, all labour, all T&P, etc complete in all respect and as per direction of the Engineer- in- charge. | 6,006.85 | cum | 274.68 | ₹16,49,961.56 |
| 6 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. | 4,640.63 | cum | 2,873.84 | ₹1,33,36,428.12 |
| 7 | Providing & applying primer coat with slow setting (SS-1) Bitumenn Emulsion on prepared surface of granular base includingclearing road surface and spraying primer @ 0.60 Kg / Sqm using mechinical means as per clause 501, 502 and section 900 and all relevant sections/ clauses of the specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. | 30,812.49 | sqm | 61.05 | ₹18,81,102.51 |
| 8 | Providing & applying tack coat with rapid setting (RS-1) Bitumen Emulsion on prepared surface including cleaning of road surface and spraying tack coat @ 0.20 K.g / Sqm using mechanical means as per Cluse No. 501, 503 and Section 900 and all relevant sections/ clauses of the Mort&h specification for road and bridgeworks of Ministry of Road Transfport& Highway (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. | 30,812.49 | sqm | 20.79 | ₹6,40,591.67 |
| 9 | Providing and laying Dense Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previously prepared surface with a paver finisher to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 507 of MoSRT&H Specifications for Road &Bridge works (5th Revision) & Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect and as per direction of the Engineer- in- charge. | 1,540.63 | cum | 14,598.41 | ₹2,24,90,748.4 |
| 10 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction Including all cost i.e cost of all materials, all labour, all T&P, royalty etc complete in all respect as per section 508,509 & all relevant sections/ clauses of Specification for road & bridge work of MoRT &H (5th Revision) & direction of Engineer in charge. | 924.38 | cum | 16,061.01 | ₹1,48,46,476.42 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Tendernotice_2.pdf
PDF • 8.44 MB
BOQ_620709.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .