Tender Value
₹33.7 L
EMD Value
₹35,000
Closing Date
6 Oct 2020, 3:00 pmClosed
Project Director
DRDA,Ranipet
Ranipet District Maintenance of 3 Nos of Roads in Thimiri Block TNRRIS 2020-21 SFC Population Grant Package no.12
2020_RDTN_179765_1
A10-462 Dated 10.09.2020
Open Tender
Civil Works
Item Rate
180 days
DRDA, Ranipet
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹35,000
14 Oct 2020
16 Sept 2020
6 Oct 2020
16 Sept 2020
6 Oct 2020
16 Sept 2020
Amount
Thimiri Block
1Maintanance of the road from varagur pudhur to arunthathiyar palayam road for 0/0- 1/200 Km (R 139 )
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 50 mm using 45 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 25 mm using 13.20 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Applying tack coat over WBM surface at 3 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
provision for sign Board
2. Maintainance of the Road from pali road to dhonimedu road for Km 0/0-1/090 Km (R 272)
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 50 mm using 45 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 25 mm using 13.20 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Applying tack coat over WBM surface at 3 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
3. Maintanance of the road from valayathur ADC to perumanthangal road for 0/0- 1/200 Km (R 144 )
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp
Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20A
Collection and supply of grity gravel for base course and side berms and labour charges for filling etc complete
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 50 mm using 45 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Adavnce patch work for making up the undulation in the existing BT surface to an average thickness of the 25 mm using 13.20 mm IRC size HBG metal with 44 kg of the Bitumen for 1 cum of metal mixed in hot mix plant laying at site
Applying tack coat over WBM surface at 3 kg/10 sq.m including labour for spraying, hire charges for bitumen sprayer etc
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM stone
Provision for KM stone
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.ABDULLA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .