Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹12.3 L+₹1.1 L (10.0%)Accepted-Finance | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹12,800
Closing Date
20 Feb 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE Civil TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Improvement works to the Junction Tower 5E building in ECHS 1 at TTPS
2023_EB_286376_1
SE Civil TTPS Spec.No.220 2022 2023
Open Tender
Civil Works - Others
Item Rate
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,800
Yes
22 Feb 2023
4 Feb 2023
21 Feb 2023
4 Feb 2023
20 Feb 2023
4 Feb 2023
Amount
Providing two legged scaffolding for 10.00 m height using 10cm dia casuarina props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W Planks of 40mm thick and 1m width etc., complete using coir and nails.
Providing working plat form for undertaking rectification works with MS pipe clamps C.W planks, Nails including cost of the materials, lead, lift, labour etc., complete.
Chipping the existing concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying, Cutting, bending & tying in position secondary reinforcement wherever necessary using GI weld mesh of size 75 x 50mm 10gauge to the existing concrete surface prepared as per specification including transporting, fabricating bending & tying in position as per the engineer at site including cost of all materials, labours, lead, lift, etc. Complete.
Plastering with C.M 1:3 20 mm thick (two layer) including cost of all materials, labours, lead, lift, curing, etc. complete.
Removing the spalled / distressed RCC from the existing concrete to an average thickness of 50mm disposal of debris with a lead of 1km and roughening the surface thoroughly with reebaklens fosroc acid/equivalent with all lead lift labour etc., complete.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
a) Applying One coat of Nito Zinc / equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site b)Providing fabricating and erecting slurry tight from work with plywood shutters with suitable supports, which do not deform (or) micro concrete for beams, columns including cost of all materials, labour, lead, lift, head load etc., complete as directed by the engineer at site. c) Providing micro concrete using Rendroc RG (or) equivalent as per manufactures specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labour, lead, lift, head load etc., complete as directed by the engineer at site. d) Applying One coat of Polymer modified Acrylic Emulsion (Nitobond AR or equivalent) in the columns, beams etc., including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site.
Removing the existing damaged felt and cleaning the roof surface free from oil, dust, dirt, grease etc., and transporting the debris with 1km lead away from the site and lowering from the surface with water till the saturation for the entire area, rate including labour, lead lift etc., complete.
Plastering with C.M 1:3, 12 mm thick with Nitobond AR mixed in cement mortar at 250ml/bag of cement rate including cost of all materials, labours, lead, lift, curing, etc. complete.
Supplying and providing water proof treatment over the existing roof slab with polymeric asphalt membrane sheet (4kg/cm2) constituting 7 layers with thermo fusible HM HDFE film one at top and other of bottom layer of this polymeric mix 1 layer of fiber glass tissue, 2 layers of polymeric mix on the top and bottom of 90 microns HM HDPE film, cracks on roof slab to be filled with cement based filter, laying of PAM sheets over a coating of 90/15 hot blown bitumen with 100mm over lap sealed by LPG flame torch further coated with oxides bitumen 90/15 and finally coated with aluminium coating and also extra attention should be given in roof / drain curve portion as per instruction of site Engineer including cost of all labour, lead, lift, T& P etc. complete.
Providing PCC 1:1.5:3 screed concrete using OP/PP cement with 6 to 10mm size machine crushed HBG metal including cost of all materials, labour, lead, lift, curing, etc. complete.
Supplying and providing Nito floor Hard top over the existing PCC/RCC concrete surface of 5Kg/Sqm and rubbed smooth with power float over the base concrete including cost of all materials, labour, lead, lift, etc., complete.
Supplying and fixing of rain water down fall pipe (4Kg/cm2) using approved quality PVC pipe of160mm dia including cost of specials, all other materials required, labour, lead, lift, etc., complete.
Providing two coats of Acrylic distemper of first class quality paint approved colour including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Providing two coats with snowcem of first class quality paint & approved colour including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, scaffolding charges, thorough cleaning of surface, labours, lead, lift, curing, etc. complete.
Writing of letter painting in the outer wall with two coat of enamel paint for background and writing letters of size 15cm bordering all round including cost of paint, labour, lead, lift, etc., complete.
Phoenix Engineering Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .