Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹59.3 CrAccepted-AOC | ₹59.3 Cr | 1 | Accepted-AOC Qualified |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 3 | Rejected-Technical 202 GALI NO D 36 CHHATTARPUR SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Ultra Mega Power Private Limited L1 |
|---|---|---|---|---|
| 1.01 | Design, Engineering and Supply,of 6 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM (TNPDCL) norms including all associated items, equipments, etc. | 1 | set | 48,85,00,000 ₹48.9 Cr |
| 2.01 | Erection, Testing, Commissioning, Stabilization, Charges towards statutory Approvals, load flow study & charges payable to TANGEDCO, etc. for entire completion of the work | 1 | set | 2,25,00,000 ₹2.3 Cr |
| 3.01Comprehensive charges of Operation and Maintenance (O&M) of the 6 MW wind farm after the date of successful completion. Quote the rate for the below including supply of spares, consumables, tools, tackles, crane arrangement, testing equipment, and instruments, manpower, insurance, fees/charges payable to Govt. agencies, liaison with govt. Agencies, payment of all charges/levies for consuming active and reactive power, all administrative work, maintaining records and submission to all concerned authorities, scheduling & forecasting charges, etc. | ||||
| 4.011st year (free guarantee period) | ||||
| 5.012nd year (free guarantee period) | ||||
| 6.01 | 3rd year | 1 | Year | 91,00,000 ₹91 L |
| 7.01 | 4th year | 1 | Year | 91,00,000 ₹91 L |
| 8.01 | 5th year | 1 | Year | 91,00,000 ₹91 L |
| 9.01 | 6th year | 1 | Year | 91,00,000 ₹91 L |
| 10.01 | 7th year | 1 | Year | 91,00,000 ₹91 L |
Tender Value
₹60.9 Cr
EMD Value
₹1.2 Cr
Closing Date
21 May 2025, 3:00 pmClosed
Chief Mechanical Engineer VOCPA
Mechanical and Electrical Engineering Department, Administrative office, VOCPA, Tuticorin 628004
Design, Engineering, SITC of 6.0 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM TNPDCL norms including Comprehensive Oand M for 11yrs with 02yrs Guarantee period
2025_VOCPT_232711_1
MEE/PM/6MW-Wind/2025
Open Tender
Power/Energy Projects/Products
180 days
V.O. C. Port Authority
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 Cr
Yes
Administrative office, VOCPA, Tuticorin4
7 Aug 2025
12 Apr 2025
22 May 2025
12 Apr 2025
21 May 2025
26 Apr 2025
12 Apr 2025 - 25 Apr 2025
25 Apr 2025
Amount
Design, Engineering and Supply,of 6 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM (TNPDCL) norms including all associated items, equipments, etc.
Erection, Testing, Commissioning, Stabilization, Charges towards statutory Approvals, load flow study & charges payable to TANGEDCO, etc. for entire completion of the work
Comprehensive charges of Operation and Maintenance (O&M) of the 6 MW wind farm after the date of successful completion. Quote the rate for the below including supply of spares, consumables, tools, tackles, crane arrangement, testing equipment, and instruments, manpower, insurance, fees/charges payable to Govt. agencies, liaison with govt. Agencies, payment of all charges/levies for consuming active and reactive power, all administrative work, maintaining records and submission to all concerned authorities, scheduling & forecasting charges, etc.
1st year (free guarantee period)
2nd year (free guarantee period)
3rd year
4th year
5th year
6th year
7th year
8th year
9th year
10th year
11th year
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid