Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.6 L+₹15,597.51 (6.38%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.6 L
EMD Value
₹7,770
Closing Date
14 Aug 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Constt of Spring NLO Haji ali mohd Bhat at Lankration Pyt Dahama Block Ramhall
2026_RDPR_320040_24
NIT NO 91 OF 2026-27 ADF RAMHALL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹7,770
19 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
14 Aug 2026
8 Aug 2026
8 Aug 2026 - 8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations,
drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including
dressing of sides and ramming of bottoms lift upto 1.5 m, including getting
out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | - | Cum | - | - |
| 2 | P/l of stone soling including all carriages.by MT10km Avg Lead | - | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 20mm nominal size aggregate. | - | Cum | - | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete in 1:1.5:3 including curing but excluding the cost of centring and shuttering. | - | Cum | 1 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | - | Kgs | 1 | - |
| 6 | Centering and Shuttering etc and removal of formwork for foundations footings bases and columnsetc | - | Sm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters
buttresses, plinth and string course fillets, kerbs and steps etc. | - | Sm | - | - |
| 8 | Structural Steel work in single Section Incl Cutting Bending and Fixing in Position incl Coat of Red oxide. | - | Kgs | 1 | - |
| 9 | Providing corrugated coloured profile G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required, 0.50 mm thick with zinc coating not less than 275 gram/m2 | 1 | Sm | - | - |
| 10 | Plaster 12 mm thick in 1: 4 mix | 1 | Sm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1062304.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .