Tender Value
₹21.1 L
EMD Value
₹42,252
Closing Date
28 Aug 2026, 5:00 pm3d left
Sumit Chopra
Municipal Committee Bhuna
Construction of Storm water Drain from Shaheed Madan lal Dhingra chowk to Shani mandir on khairi road Bhuna. Retender
2026_HRY_542022_1
2026B861815D 16BE 4E04 8C9B C3C52ED22C67275ULB
Open Tender
Civil Works
Works
120 days
Bhuna
2nd time
2 documents required · 2 mandatory
₹1,000
₹42,252
Yes
19 Aug 2026
19 Aug 2026
31 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
19 Aug 2026 - 21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate] | 1,055.65 | Sqm | 139 | ₹1,46,735.91 |
| 2 | [17.5.3]Compacting Original Ground 3. Compaction of Earthwork
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate] | 462.01 | Sqm | 7 | ₹3,234.08 |
| 3 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 75 | Sqm | 655 | ₹49,125 |
| 4 | [2.B1220] B1220. RCC pipe 450 mm dia NP-3 spigot [Rate] | 12.19 | Metre | 1,450 | ₹17,678.4 |
| 5 | [3.1.18]By Mechanical Transport including loading, unloading and stacking 18. Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead up to 10 km for all lifts, complete as per directions of Engineer-in-charge. [Rate] | 231.01 | cum | 202 | ₹46,663.21 |
| 6 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 568.71 | cum | 78 | ₹44,359.46 |
| 7 | [6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate] | 69.3 | cum | 2,442 | ₹1,69,235.48 |
| 8 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 64.83 | cum | 6,113 | ₹3,96,324.13 |
| 9 | [6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate] | 462.01 | Sqm | 208 | ₹96,098.29 |
| 10 | [6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate] | 6,000 | Kg. | 66 | ₹3,96,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_621475.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].