| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L1 | Accepted-AOC L1 | |
| 2 | L2₹28.9 L+₹1.4 L (5.20%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹22,100
Closing Date
21 Apr 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes and providing cement pedestal for a length of 180mtrs from sewage treatment plant arch to before EE/CMD I office. GLR III to DM Plant II raw water line incl
2025_EB_539008_1
CE/SE/O/TTPS/Spec.No.75/25-26
Open Tender
Miscellaneous Works
Item Rate
30 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹22,100
Yes
13 May 2025
5 Apr 2025
22 Apr 2025
5 Apr 2025
21 Apr 2025
5 Apr 2025
Supply Portion: Supply of 219.1mm OD seamless pipes with the following specifications: OD : 219.1mm, Thickness: 12.7mm
Erection Portion:Charges for loading and unloading of new 200NB M.S pipe from stores to work spot.
Charges for dismantling of existing damaged 200NB M.S pipes loading and unloading the same to store as per the instruction of engineer in charge.
Charges for erection of new M.S. 200NB pipe laying, aligning over rack by cutting & welding with suitable supports and related work.
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and initial lift of 2m and disposing the excavated earth 1Km. away from the site including cost of all materials, labours, lead, lift, etc. complete - (SS20B) - Page 26, Sch. item No.50.
Providing PCC 1:4:8 using OP/PP cement with 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing RCC 1:1.5:3 using OP/PP cement with 12 to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work..
Providing centering and shuttering using steel structures & props 10 to 13 cm. dia including cost of all materials, labours, lead, lift, etc. complete.
Supplying & providing RTS/MS rod including cutting, bending, tying & fixing in position as per specification including binding wires, cost of all other materials, labours, lead, lift, curing, etc. complete.
Refilling with excavated soil other than sand complying with standard specification for filling in foundation and basement with watering and consolidation including cost of all materials, labours, lead, lift, etc. complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .