| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Tender fee and earnest money not received |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
25 Sept 2023, 4:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle, santkabirnagar
A total of 40 works under the EDD-Mehdawal, respectively, 36 works of capacity increase work of overloaded distribution transformers, 3 works of trolley transformer installation work, work of separation of Pachpokhari Indodutch feeder on semi turnkey
2023_PVVNV_835818_1
75/EDC(SKN)2023-24
Open Tender
Electrical Works
Fixed-rate
90 days
Sant Kabir Nagar
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
S.E.E.D.C. Sant Kabir Nagar
₹20,000
7 Oct 2023
7 Sept 2023
26 Sept 2023
7 Sept 2023
25 Sept 2023
7 Sept 2023
DECENTRALISED ITEM NAME (EXCLUDING GST)
AL LUG 70SQMM
CROSS ARM HOLDING CLAMP
F BRACKET
STAY CLAMP
STAY LOOP INSULATOR
MS NUT BOLT
BARBED WIRE
CLAMP FOR CHANEL
GI EARTHING SPIKE MADE OF 20MM SOLID ROD
PG CLAMP
GI PIPE 6"DIA
GAURDING ANGLE CLAMP
LUG 240SQMM
New Trolly fitted With all fixing item with suitable for 400KVA
WORK DETAILS (EXCLUDING GST) (उक्त कार्य के निष्पादन मे प्राक्कलन एवं इस सूची मे दर्ज सामग्री के अतिरिक्त यदि कोई अन्य टी एंड पी आइटम/ विकेंद्रीयकृत सामग्री की आवश्यकता पड़ती है तो कार्यदायी संस्था द्वारा उपलब्ध कराते हुये कार्य को ससमय पूर्ण करा लिया जायेगा एवं कोई अतिरिक्त धनराशि देय नहीं होगी )
CARRIGE OF 25 KVA TRANSFORMER FROM STORE TO SITE
RETURNINGOF 16 KVA TRANSFORMER FROM SITE TO STORE
CARRIGE OF 63 KVA TRANSFORMER FROM STORE TO SITE
RETURNING OF 25 KVA TRANSFORMER FROM SITETO STORE
CARRIGE OF 100 KVA TRANSFORMER FROM STORE TO SITE
RETURNING OF 63 KVA TRANSFORMER FROM SITETO STORE
ERRECTION OF 25 KVA TRANSFORMER
ERRECTION OF 63 KVA TRANSFORMER
ERRECTION OF 100 KVA TRANSFORMER
Carriage of Conductor/Material From Store To Site
Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering
Erection of Sectional Double Pole Structure of pcc pole including digging of pit, fitting of all accessories, back filling of earth, grouting of each pole & stay sets with materials & other required works.
Erection of single support ST/PCC pole for construction of 11 KV/LT line including digging of pit, fitting of all accessories, back filling of earth & others required work.
Earthing of Poles
Installation and Commisioning of 11 KV VCB(O/G) with all Wirings
Laying of 11 KV XLPE 3x70 SQ MM
Carriage of 400KVA Distrubution Transformer From Store To Nagar Panchayat BELHARKALA with newly fitted Trolly.
Carriage of 400KVA Distrubution Transformer From Store To BAKHIRA with newly fitted Trolly.
Mounting/Commisioning of 400 KVA Distribution Transformer at Trolly(4 Wheels With Fencing Grill and DO fuse fitted)
Carriage of 400KVA Distrubution Transformer From Store To Nagar Panchayat mehdawalwith newly fitted Trolly.
M/S JAISWAL BROTHERS
M/S SAUMITRA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .