Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical UTTAR PRADESH 229001 | RAE BARELI | UTTAR PRADESH | 229001 | Accepted-Technical ok |
| 3 | Not Admitted-Fee/PreQual/Technical 0 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹31,000
Closing Date
16 Mar 2026, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
R.C.C. Casting of Approach Road (Over B.O.E. Surface) at 132 KV Sub Station Gosaisinghpur Sultanpur
2026_UPCTL_1114975_1
111/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
30 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Superintending Engineer, E.C.T.C. Lucknow
₹31,000
10 Apr 2026
11 Feb 2026
17 Mar 2026
11 Feb 2026
16 Mar 2026
11 Feb 2026
R.C.C. Casting of Approach Road (Over B.O.E. Surface) at 132kV S/S Gosaisinghpur, Sultanpur
Bill Of Quantity
R.C.C. Casting of Approach Road (Over B.O.E. Surface) at 132kV S/S Gosaisinghpur, Sultanpur.(SOR-05/24) Group-5
Total
Conditions
The quantities in BOQ are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
All civil work shall be executed according to the approved drawings of UPPTCL.
Pozzlona Portland cement confirming to IS 1489 (Part 1) 1991 of approved quality like ACC,Ultra-Tech, Birla or equi. Shall only be used.
Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor.
Labor Cess, Royalty and all other taxs will be the liability of the firm/contractor, only GST will be paid by the department.
The firm should observe the work site before participating in the tender.
All work will be done according to UPPWD/UPPTCL specification or as per direction by the Engineer Incharge.
Test of all the construction materials shall be done by the contractor at their own cost from the lab approved by NABL as per direction Engineer Incharege .In case of unsatisfactory test result the dismanteling and reconstruction of structure shall be done by the contractor at their own cost.
During the work, the entire responsibility of protecting the human power (labor, mason etc.) appointed at the construction site will be of the firm/contractor and the entire responsibility of any untoward incident will be of the firm/contractor.
For the construction JCB Machine etc will be taken to switch yard only with the written permission of the related JE (Civil)/SDO (Civil). In case of any accident the entire responsibility of the damage will be of the Contractor.
Dismantling of Brick works the material shall be recoverd 60% as bricks and 30% as Brick Bats that material shall be property of the contractor recovered at prevailing/ pertaining SOR.
The amount of scrap steel recovered from dismantling shall be issued to contractor/firm at the rate1/3rd of rates in prevailing/ pertaining SOR.
If tendered or quoted rates are below w.r.t. Departmental SOR then additional security/ performance guaranty shall be deposited by tenderer as per G.O. No.622/23-12-2012-02-audit-08.
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
Tendernotice_2.pdf
PDF • 0.78 MB
Tendernotice_3.pdf
PDF • 0.59 MB
BOQ_2068336.xls
BOQ • 0.30 MB
TN111Corrigendum01.pdf
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .