| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | +2.48% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.8 CrAdmitted-Finance 32 DHARSA MULLICKPARA 3RD BYE LANE G I P COLONY DIST HOWRAH PIN 711112 | HOWRAH | HOWRAH | WEST BENGAL | 711112 | +2.48% | ₹1.8 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.9 Cr+₹1.1 L (0.61%)Admitted-Finance | +3.11% | ₹1.9 Cr+₹1.1 L (0.61%) | L2 | Admitted-Finance |
| 4 | L3₹1.9 Cr+₹4.5 L (2.45%)Admitted-Finance VIVEKANANDAPALLY MIRCHAK P S ENGLISH BAZAR DIST MALDA 732101 | ENGLISH BAZAR | MALDA | WEST BENGAL | 732101 | +4.99% | ₹1.9 Cr+₹4.5 L (2.45%) | L3 | Admitted-Finance |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
27 Feb 2026, 10:00 amClosed
SE attached to CE(N)
Office of the Chief Engineer (North), Green Park, Malda
Bank protection work at right bank of river Mahananda for a length of 600.00 m at village-Khidirpur, Mouza-Islampur, G.P.- Kharba, Block-Chanchal-I in District-Malda
2026_IWD_997519_3
WBIW/SE/CE(N)/NIT-4(e)/2025-26
Open Tender
CIVIL WORKS
Percentage
135 days
Khidirpur, Chanchal, Malda
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.6 L
Yes
27 Aug 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
27 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 5,400 | SQM | 5.96 | ₹32,184 |
| 2 | Supplying Nylon cage netting1 metre x 1metre x1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 0.2 | EACH | 139.44 | ₹27.75 |
| 3 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:-Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre x 1metre x 1metre.
(a) Where boats are not necessary. | 819 | Each | 460.03 | ₹3,76,764.57 |
| 4 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:-Volume of each earth/ sand filled bags should not be less than 0.028 m3. Size of Nylon crate is 1metre x 1metre x 1metre.
(a) Where boats are necessary. | 7,368 | Each | 473.14 | ₹34,86,095.52 |
| 5 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in H.D.P.E. bags (minimum 13 nos. ) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches up to 50 cms depth, if necessary, or by boat including cost of hire charges of boat with boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:-Volume of each earth/ sand filled bags should not be less than 0.0328 m3. Size of Nylon crate is 1.0 metre x 1.0 metre x 0.60 metre. b) Where boats are not necessary. | 2,126 | EACH | 516.77 | ₹10,98,653.02 |
| 6 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.
(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. | 0.6 | CUM | 117.99 | ₹70.79 |
| 7 | Supplying Nylon cage netting of size 1.0 metre x 1.0 metre x 0.40 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. | 7,241 | EACH | 83.67 | ₹6,05,854.47 |
| 8 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in H.D.P.E. bags (minimum 15 nos. ) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches up to 50 cms depth, if necessary, or by boat including cost of hire charges of boat with boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge. NB:- Volume of each earth/ sand filled bags should not be less than 0.0328 m3. Size of Nylon crate is 1.0 metre x 1.0 metre x 0.40 metre. b) Where boats are not necessary. Considering 85% filling of each bags for compacting in the crate for slope pitching as per guideline. | 7,241 | EACH | 596.23 | ₹43,17,301.43 |
| 9 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. | 4,688 | Cum | 323.33 | ₹15,15,771.04 |
| 10 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 1,67,425 | EACH | 7.15 | ₹11,97,088.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.07 MB
BOQ_2442493.xls
BOQ • 0.35 MB
2911.pdf
Tender Documents • 1.17 MB
BarChart03.pdf
Tender Documents • 0.20 MB
Drawings.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .