Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.9 L
Closing Date
21 Dec 2021, 6:55 pmClosed
Xen REW Poonch
Xen REW Poonch
please refer in boq
2021_RDPR_153072_3
e-NIT No. 369 of REW POONCH, Dated 11-12-2021
Open Tender
Civil Works
Item Rate
60 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Xen REW Poonch
Exempted
24 Dec 2021
14 Dec 2021
22 Dec 2021
14 Dec 2021
21 Dec 2021
14 Dec 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.... All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with . 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 30% Boulder. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand),
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for:Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form work for:Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, pillars, piers, abutments, posts and struts.
Centering and shuttering including strutting, propping etc. and removal of form work for:Lintel, beams, plinth beams, girders, bressumers and cantilevers
Edges of slabs and breaks in floors and walls. Under 20 cm wide
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
15mm Cement plaster on the rough side of single or half brick wall of mix: ( 1 cement : 6 fine sand)
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade on New work (two or more coats) over and including priming coat with water thinnable cement primer
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):.Second class kail wood
Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick.First Class kail wood
Providing and laying Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand and manufacturer, in all colours and shades, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately). 1 Size of tile 500x500 mm
Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete
Carriage of Sand / Bajre 25 KM ByM/T and 100 Mtrs by H/L
Carriage of Stone 5 KM ByM/T
Carriage of Bricks 210 Km By M/T and 100 Mtr BY H/L
Installation / Construction of Sign Board (C.I.B) Showing details of project of required specifications, as directed by Engineer Incharge at Site.
MS MOHD ASIF Contractor
M/S Nazir Hussain shah
M/S RABIA BUKHARI
AMIR HUSSAIN SHAH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .