Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
16 Oct 2026, 12:30 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE OFFICER
ARULMIGU SUBRAMANIYASWAMY TEMPLE CHENNIMALAI PERUNDURAI TK ERODE DT 638051
PROVIDING GALVALUME SHEET ROOF SHED FOR TWO WHEELER PARKING CONSTRUCTION OF COMPOUND WALL AND FRONT GATE ARRANGEMENTS IN STAFF QUARTER AT ARULMIGU SUBRAMANIYASWAMY TEMPLE CHENNIMALAI PERUNDURAI TK ERODE DT 638051
2026_HRCE_710073_1
ERODE/05/2023-2024 TNBILL/2002/12933
Open Tender
Civil Works
Item Rate
180 days
ARULMIGU SUBRAMANIYASWAMY TEMPLE CHENNIMALAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹22,000
1 Oct 2026
1 Oct 2026
16 Oct 2026
1 Oct 2026
16 Oct 2026
8 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation in all soils and sub soils and to full depth as may be directed except in, Hard rock requiring blasting, but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed watered consolidated and depositing the surplus earth within the compound in places as shown by the departmental officers with an initial lead, and lift etc., complete complying with standard specifications. ( Narrow foundation) | 50 | Cubic meter | - | - |
| 2 | Supplying and filling in foundation and basement with M sand in layers of not more than 15cm.thick well rammed watered and compactedetc., complete complying with standard specification. | 6 | Cubic meter | - | - |
| 3 | Providing and laying Plain Cement concrete 1:5:10 (one cement Five M sand & Ten HBGS jelly) using 40mm HBGS jelly including dewatering by bailing/pumping wherever necessary laying the concrete in layers not more than 15 cm thick and in bays with all leads and lifts, compacting and finishing the surface, watering, curing etc.,complete complying with standard specifications and as directed by the departmental officers for Foundation works. | 6 | Cubic meter | - | - |
| 4 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener,side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). | 95 | Square meter | - | - |
| 5 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 131 | Square meter | - | - |
| 6 | Brick work in Cement Mortar 1:6 ( One cement and six M sand) using II class ground moulded chamber burnt bricks of size 9"x4-1/2"x3" for Super structure including curing etc.,complete complying with standard specification. | - | - | - | - |
| 7 | Foundation & Basement | 9.5 | Cubic meter | - | - |
| 8 | Super structure | 31.5 | Cubic meter | - | - |
| 9 | Brick masonry Cement Mortar 1:4 using Country bricks including all varivargams, moulds,sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete 100 cft for vimanam / gopuram | 3 | Cubic meter | - | - |
| 10 | Providing and laying Plain Cement concrete 1:2:4 (one cement Two M sand & Four HBGS jelly) using 20mm HBGS jelly including finishing the surface, watering, curing etc.,complete complying with standard specifications and as directed by the departmental officers for Foundation works. | 5 | Cubic meter | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
STAFFPQ.pdf
Tender Documents • 0.77 MB
STAFFDRAWING.pdf
Additional Documents • 0.93 MB
BOQ_853207.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .