Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | -11.25% | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹46.3 L (10.4%)Admitted-Finance | -2.00% | ₹4.9 Cr+₹46.3 L (10.4%) | L2 | Admitted-Finance |
Tender Value
₹5 Cr
EMD Value
₹10 L
Closing Date
9 Jun 2026, 4:00 pmClosed
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Ex. Engineer, Div. No. 01 JMC Dogra Hall, Jammu
Restoration of lane and drain and others allied works in Ward No. 1, 2, 3, 4, 5, 6, 7, 8 , 9, 14, 19 and 71 and Gummat Gate after demolition the existing compromised structure by way of re-ecting RCC protection walls upto height of 7-0 on both sid
2026_HAUDD_311476_1
Division No. 1/JMC/26-27/Fresh e-NIT No. 17
Open Tender
Civil Works
Percentage
JMC Wards
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Yes
FA/Chief Accounts Officer JMC
₹10 L
19 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for desilting,readjustment of manholes covers, diverting the direction of water dewatering during the execution of work and disposal away from site. | 134 | No | 553 | ₹74,102 |
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead For thickness of tiles above 25 mm and upto 40 mm. | 1,798 | Sqm | 89.95 | ₹1,61,730.1 |
| 3 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 325 | Cum | 1,037.55 | ₹3,37,203.75 |
| 4 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead. | 84 | Sqm | 125.35 | ₹10,529.4 |
| 5 | Dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material upto a lead of 1 kilometer, as per direction of Engineer-in-charge. | 29 | Sqm | 336.3 | ₹9,752.7 |
| 6 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road. | 262 | Sqm | 305.95 | ₹80,158.9 |
| 7 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:4:8 or leaner mix (i/c equivalent design mix) | 3 | cum | 1,064.55 | ₹3,193.65 |
| 8 | Demolishing lime concrete manually/by mechanical means and disposal of material within 50 meters lead as per direction of Engineer-in-charge. | 79 | Cum | 602.8 | ₹47,621.2 |
| 9 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar | 3 | Cum | 1,458.45 | ₹4,375.35 |
| 10 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
15.2.1 1:3:6 or richer mix (i/c equivalent design mix) | 429 | Cum | 1,725.2 | ₹7,40,110.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_1008516.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .