Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26,021.95Admitted-Finance | -72.02% | ₹26,021.95 | L1 | Admitted-Finance |
| 2 | L2₹31,946.17Admitted-Finance | -65.65% | ₹31,946.17 | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
20 May 2026, 6:00 pmClosed
Executive Engineer PWD Divison Gandoh
Executive Engineer PWD Divison Gandoh
Stage Contract for maintenance and snow clearance of TKN Road from km 28th to 36th for the year 2026-27
2026_PWDJK_310019_1
E-NIT 7 of 2025-26
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD Divison Gandoh
₹20,000
25 May 2026
15 May 2026
21 May 2026
15 May 2026
20 May 2026
15 May 2026
15 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Slip Clerance In ordinary soil disposal lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 154.15 | ₹154.15 | BI01010001010000000000000515BI0100001114 |
| 2 | Slip Clearance In soils; mixed with moorum /Kankar /shingle/b oulders; disposal lead upto 50 m and lift upto 1.5 m. | 1 | Cum | 331.15 | ₹331.15 | BI01010001010000000000000515BI0100001115 |
| 3 | Slip Clarance In soils; mixed with Decomposed Rocks; by blasting or any other means | 1 | Cum | 411.4 | ₹411.4 | BI01010001010000000000000515BI0100001116 |
| 4 | Slip Clearance In medium hard rocks by blasting | 1 | Cum | 492.7 | ₹492.7 | BI01010001010000000000000515BI0100001117 |
| 5 | Slip Clearance In hard rocks by blasting | 1 | Cum | 686.3 | ₹686.3 | BI01010001010000000000000515BI0100001118 |
| 6 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeAll kind of soil | 1 | Cum | 187.3 | ₹187.3 | BI01010001010000000000000515BI0100001120 |
| 7 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeOrdinary Rock | 1 | Cum | 392.8 | ₹392.8 | BI01010001010000000000000515BI0100001121 |
| 8 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock | 1 | Cum | 687.1 | ₹687.1 | BI01010001010000000000000515BI0100001122 |
| 9 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock( Blasting Prohabited) | 1 | Cum | 1,128.75 | ₹1,128.75 | - |
| 10 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | 1 | Cum | 592.9 | ₹592.9 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1003209.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid