| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC AT PO PANCHUPALI PS GHASIPURA KEONJHAR 758020 | KEONJHAR | KEONJHAR | ODISHA | 758020 | ₹6.8 L | L1 | Accepted-AOC Winner in the transparent lottery system for award of contract. |
| 2 | L1₹6.8 LRejected-Finance | ₹6.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 3 | L1₹6.8 LRejected-Finance | ₹6.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 4 | L1₹6.8 LRejected-Finance | ₹6.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
| 5 | L1₹6.8 LRejected-Finance | ₹6.8 L | L1 | Rejected-Finance Not won in the transparent lottery system |
Tender Value
Refer Docs
EMD Value
₹6,800
Closing Date
23 Jul 2026, 5:00 pmClosed
S.E, Angul Irr. Divn. Angul
O.O the S.E, Angul Irr. Divn. Angul, At/P.O- Hakimpada, Dist-Angul
Improvement to Balance portion of Service Road of Ghunchapal Minor RD 915m to 1250m of Derjang Irrigation Project.
2026_CEBBS_135328_6
SE-AID-4/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Angul
3 documents required · 3 mandatory
₹4,000
₹6,800
Yes
10 Sept 2026
14 Jul 2026
24 Jul 2026
14 Jul 2026
23 Jul 2026
14 Jul 2026
14 Jul 2026 - 18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Fine dressing of earth work in ordinary soil / hard soil in road formation including cutting or filling earth up to 0.15m depth of surface etc. including cost, conveyance, taxes of all materials and cost of all labour, T&P with all cost of incidental charges and cess etc complete as per approved specification and direction of the Engineer -in- Charge. | 1,134 | One Sqm | 5.5 | ₹6,237 |
| - | Providing, laying, spreading and compacting graded stone aggrgate to wet mix macadam specification including premixing the material with water at OMC in machanicl mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost, conveyance, royalty, taxes of all materials and hire & running charges of machineries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge | 94.5 | One Cum | 2,484.2 | ₹2,34,756.9 |
| 3 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.60kg/sqm using mechanical means including cost, conveyance, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 945 | One Sqm | 55 | ₹51,975 |
| 4 | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @ 0.20kg/sqm on the prepared bituminous/granular surface cleaned with machanical broom including cost, conveyance, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 945 | One Sqm | 26.4 | ₹24,948 |
| 5 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete all respects cost, conveyance, royalty, taxes of all materials and hire & running charges of machineries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 23.63 | One Cum | 14,053 | ₹3,32,072.39 |
| 6 | Collecting, supplying and stacking good quality moorum at road side in regular box heaps of size (1.50m x 1.50m. x 0.44 m.) to be measured as one cum. and conveying from stacks and spreading moorum in uniform thickness on road surface including watering and rolling with PRR, hire & running charges of machineries including cost, carriage, royalty, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 28.35 | One Cum | 1,028.2 | ₹29,149.47 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_601012.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.34 MB
6BidDocuments.pdf
Tender Documents • 4.20 MB
BOQ_601012.xls
BOQ • 0.24 MB
4Corrigendum.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .